B518 Power Plant Maintenance
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force (FA4600 55 CONS PKP) has issued a Combined Synopsis/Solicitation (FA460026Q0013) for B518 Power Plant Maintenance at Offutt Air Force Base, NE. This Total Small Business Set-Aside requires contractors to operate, maintain, install, refuel, and repair electric generating plant electrical systems. Offers are due Monday, March 09, 2026, at 11:00 AM CST.
Scope of Work
The contractor will provide 24/7 operation, maintenance, installation, refueling, and repair of energized and de-energized facility and power distribution components, electric circuits, electric control systems, and associated equipment at Building 518. Key responsibilities include:
- Ensuring continuous and reliable electric power generation, meeting specified voltage and frequency requirements.
- Developing and executing an Electronic Preventative Maintenance and Inspection (EPMI) program, including cybersecurity for control systems.
- Operating and maintaining liquid fuel systems, acting as Tank Custodian, and responding to fuel spills.
- Adhering to numerous Unified Facility Criteria (UFC), Air Force Manuals (DAFMAN), NFPA standards, Original Equipment Manufacturer (OEM) manuals, and environmental regulations.
- Submitting various reports, including weekly EPMI, monthly APIMS logs, calibration records, outage reports, and fuel tank inspection reports.
- All services are identified as Mission Essential.
Contract Details & Set-Aside
- Contract Type: Combined Synopsis/Solicitation (Implied Fixed-Price based on CLIN structure).
- Period of Performance: Base period from August 01, 2026, to July 31, 2027, with option periods extending through September 30, 2029.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5) under NAICS Code 561210.
- Applicable Laws: Service Contract Labor Standards FAR 52.222-41 and Wage Determination # 2015-5005, revision 27 (revised December 03, 2025).
- Place of Performance: Offutt Air Force Base, NE.
Submission & Evaluation
Offers will be evaluated on Price and Technical factors, with the award made to the most advantageous offeror. The Government intends to award without discussions. Technical Capability Plan (max 16 pages) must detail:
- 24/7 shift schedule for manning.
- References for maintaining similar equipment (age and megawatt level).
- Work experience, certifications, training, and corporate history for operating specific power generation equipment.
- Standard Operating Procedure (SOP) for government-ordered generator backup power outside of monthly tests. All prospective offerors must be registered in SAM.gov.
Key Dates & Contacts
- Published Date: February 09, 2026 (Amendment 0001).
- Site Visit: Wednesday, February 18, 2026, at 09:00 AM CST. An EAL request must be submitted to A1C Hunter Hendrix by COB February 16, 2026, for base access.
- Questions Due: Tuesday, February 24, 2026, at 11:00 AM CST.
- Answers Posted: Thursday, February 26, 2026.
- Offer Due Date: Monday, March 09, 2026, at 11:00 AM CST.
- Quotes Validity: 60 calendar days from submission.
- Primary Contact: A1C Hunter Hendrix (hunter.hendrix.1@us.af.mil, 402-294-5206).
- Secondary Contact: Mr. Casey L Hupton (casey.hupton.1@us.af.mil, 402-232-1475).
Important Attachments
Bidders should review the Performance Work Statement (PWS) and Wage Determination # 2015-5005. Other critical attachments include forms for labor reporting, calibration, outage reporting, employee rosters, and fuel tank consumption.