B518 Power Plant Maintenance

SOL #: FA460026Q0013Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4600 55 CONS PKP
OFFUTT AFB, NE, 68113, United States

Place of Performance

St Columbans, NE

NAICS

Facilities Support Services (561210)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Special Industry Machinery (J036)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 5, 2026
2
Last Updated
Mar 9, 2026
3
Submission Deadline
Mar 12, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, 55 CONS PKP, is soliciting proposals for B518 Power Plant Maintenance at Offutt Air Force Base, NE. This requirement is for the operation and maintenance of electric generating plant electrical systems at Building 518. This is a Total Small Business Set-Aside. Proposals are due Thursday, March 12, 2026, at 11:00 AM CST.

Scope of Work

The contractor will be responsible for the 24/7 operation, maintenance, installation, refueling, and repair of energized and de-energized facility and power distribution components, electric circuits, electric control systems, and associated equipment at Bldg 518. Key responsibilities include:

  • Providing continuous 24/7 manning with appropriate craft types.
  • Developing and executing an Electronic Preventative Maintenance and Inspection (EPMI) program.
  • Operating and maintaining liquid fuel systems, including acting as Tank Custodian.
  • Maintaining all low and medium voltage systems less than 4160v.
  • Ensuring compliance with numerous Unified Facility Criteria (UFC), Air Force Manuals (DAFMAN), NFPA standards, OEM manuals, and extensive environmental regulations.
  • All services are identified as Mission Essential.

Contract & Timeline

  • Contract Type: Firm Fixed Price
  • Period of Performance: Base period from August 1, 2026, to July 31, 2027, with option periods extending through September 30, 2029.
  • Set-Aside: 100% Small Business Set-Aside (NAICS Code 561210).
  • Proposal Due Date: Thursday, March 12, 2026, at 11:00 AM CST.
  • Published Date: March 5, 2026.

Submission & Evaluation

Proposals must include a Price Quotation, a Technical Capability plan (maximum 20 pages), and completed Fill-In Clauses/Provisions. Technical Capability should detail a 24/7 shift schedule, references for similar equipment maintenance, work experience/certifications for power generation equipment, and an SOP for government-ordered generator backup power. Submissions are via email to A1C Hunter Hendrix (hunter.hendrix.1@us.af.mil) and Casey Hupton (casey.hupton.1@us.af.mil). Evaluation will be based on Price and Technical factors, with an award made to the most advantageous offeror. The Government intends to award without discussions.

Special Requirements & Notes

  • A site visit was scheduled for February 18, 2026 (date passed).
  • Cybersecurity Maturity Model Certification (CMMC) Level 2 (Self) is required prior to award.
  • This solicitation is subject to the Service Contract Labor Standards (FAR 52.222-41) and Wage Determination WD # 2015-5005, revision 27.
  • Personnel require a favorable National Agency Check with Inquiries (NACI) investigation for Common Access Card (CAC) eligibility.
  • Extensive environmental compliance and reporting requirements are detailed in Attachment 24 (Appendix E) and Attachment 25 (Appendix F).

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Mar 9, 2026
View
Version 5Viewing
Combined Synopsis/Solicitation
Posted: Mar 5, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Mar 5, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Feb 9, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 6, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 5, 2026
View