Berthing and Messing Barge YRBM-57 Intermediate Maintenance Availability (IMAV)

SOL #: N6264926RA011Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVSUP FLT LOG CTR YOKOSUKA
FPO, AP, 96349-1500, United States

Place of Performance

Yokosuka, JP-14, Japan

NAICS

Ship Building and Repairing (336611)

PSC

Non Nuclear Ship Repair (West) Ship Repair (Including Overhauls And Conversions) Performed On. Non Nuclear Propelled And Nonpropelled Ships West Of The 108th Meridian (J999)

Set Aside

No set aside specified

Timeline

1
Posted
Nov 26, 2025
2
Last Updated
Feb 19, 2026
3
Submission Deadline
Jan 26, 2026, 1:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy (NAVSUP FLCY) is soliciting proposals for the Intermediate Maintenance Availability (IMAV) of the Berthing and Messing Barge YRBM-57 at Yokosuka Naval Base, Japan. This is a Firm Fixed-Price opportunity requiring contractors to possess an active U.S. Navy Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR). The proposal submission deadline is January 26, 2026, at 10:00 AM Japan Standard Time (JST).

Scope of Work

This requirement involves comprehensive repair and maintenance for the YRBM-57 barge. Key work items include:

  • Sewage Collection, Holding Tank (CHT) Inspection and Repair (WI 123-16-001): Opening, ventilating, cleaning, inspecting, and repairing CHT tanks and associated piping, requiring Marine Chemist certification.
  • Split Air Conditioning Systems Upgrade (WI 514-20-001 Rev.1): Modification and installation of new Split AC Systems, including Mitsubishi Electric units, removal of obsolete equipment, and installation of insulation and jacketing.
  • Cosmetic Polymeric Deck Covering System Replacement (WI 634-11-001): Replacement of deck covering systems on the 03 Level Stairway, conforming to MIL-D-24613 Type I Class 2. The contractor must provide all necessary tools, labor, and material, adhering to NAVSEA Standard Items and specific technical references.

Contract Details

  • Contract Type: Firm Fixed Price, awarded as a job order under an existing MARAV.
  • Period of Performance: March 1, 2026, to June 15, 2026.
  • Place of Performance: Yokosuka Naval Base, Japan.
  • Eligibility: Offerors must possess an active U.S. Navy MSRA/ABR as a Prime Contractor and be authorized to operate and do business in Japan. This is a non-mandatory synopsis.
  • Product Service Code: J999 - Non Nuclear Ship Repair.

Submission & Evaluation

  • Proposal Submission Deadline: January 26, 2026, at 10:00 AM JST.
  • Access to Work Specifications (Attachment I): Offerors must request access by sending an email to Kazuo.Takamura.ln@us.navy.mil or peterjommel.s.arrieta.ln@us.navy.mil by December 15, 2025, 10:00 AM JST. Access is granted for 14 days.
  • Submission Method: Proposals must be submitted electronically via email.
  • Evaluation: Award will be made to the responsible, technically acceptable offeror with the lowest evaluated price. Price is the dominant factor.

Key Amendments & Notes

  • Amendment 0003 (Jan 22, 2026): Addressed contractor questions regarding Contractor Furnished Material (CFM). The government will not accept requests to change CFM to Government Furnished Material (GFM) if it results in lead times exceeding six months. Contractors are advised to investigate other options or Japanese equivalents for specific Mitsubishi Electric AC components.
  • Amendment 0002 (Jan 5, 2026): Reopened the solicitation due to no bids received and extended the proposal deadline to January 26, 2026.
  • Amendment 0001 (Dec 4, 2025): Responded to initial questions and provided a revised Work Item 514-20-001.

People

Points of Contact

Kazuo TakamuraPRIMARY
Peter ArrietaSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Solicitation
Posted: Feb 19, 2026
View
Version 6
Solicitation
Posted: Feb 4, 2026
View
Version 5
Solicitation
Posted: Jan 26, 2026
View
Version 4Viewing
Solicitation
Posted: Jan 22, 2026
Version 3
Solicitation
Posted: Jan 5, 2026
View
Version 2
Solicitation
Posted: Dec 4, 2025
View
Version 1
Solicitation
Posted: Nov 26, 2025
View