Z--BISO MAINT TO BANDY CREEK WATER TANK

SOL #: 140P5326R0016Combined Synopsis/Solicitation

Overview

Buyer

Interior
National Park Service
SER NORTH MABO (53000)
GATLINBURG, TN, 37738, United States

Place of Performance

Oneida, TN

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Repair Or Alteration Of Restoration Of Real Property (Public Or Private) (Z2QA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 21, 2026
2
Last Updated
May 21, 2026
3
Submission Deadline
May 22, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), Big South Fork National River and Recreation Area, is soliciting proposals for cyclic maintenance of the 75,000-gallon steel potable water storage tank at Bandy Creek Campground, Oneida, TN. This is a 100% Total Small Business Set-Aside procurement. The work aims to restore protective coatings, correct deficiencies, and extend the tank's operational life. Proposals are due May 22, 2026, at 5:00 PM EDT.

Scope of Work

The contractor shall provide all labor, materials, equipment, and incidentals for comprehensive tank maintenance. Key tasks include:

  • Draining, isolation, and removal/disposal of accumulated sediment.
  • Interior and exterior cleaning, surface preparation (including abrasive blasting per SSPC-SP10 / NACE No. 2 for interior), and corrosion removal.
  • Application of interior potable water coatings (NSF/ANSI 61) and exterior protective coatings (AWWA D102).
  • Minor hardware replacement, vent screen repair, and tank disinfection.
  • Installation of a remote tank level monitoring and SCADA telemetry system. Work must comply with industry standards (AWWA D102, C652, SSPC, NACE, NSF/ANSI 61) and regulatory requirements (OSHA, EPA, TDEC). A minimum five-year coating warranty is required.

Contract & Timeline

  • Contract Type: Firm Fixed Price (FFP) Construction.
  • Set-Aside: 100% Total Small Business Set-Aside.
  • NAICS: 237110 Water and Sewer Line and Related Structures Construction ($45M size standard).
  • Period of Performance: 90 calendar days from Notice to Proceed (NTP).
  • Site Visit: May 12, 2026, at 11:00 AM EDT at Bandy Creek Campground.
  • Questions Cut-off: May 13, 2026, 1:00 PM EDT.
  • Proposal Due: May 22, 2026, 5:00 PM EDT.

Evaluation Criteria

Award will be based on Lowest Price Technically Acceptable (LPTA). Technical acceptability is evaluated on a Pass/Fail basis across five factors:

  1. Relevant Experience: Two completed projects within 5 years (steel water tank maintenance, coating, surface prep, confined space).
  2. Key Subcontractors and Personnel: Qualified personnel for coating inspection, confined space, fall protection, coating application, SCADA/telemetry.
  3. SOW/Specification Compliance: Adherence to all technical requirements.
  4. Period of Performance: Agreement to complete within 90 days.
  5. Technical Approach: Brief approach (1-2 pages) covering surface prep, coating, containment, QC, and SCADA. Past performance and price reasonableness will also be evaluated.

Special Requirements

Offerors must be registered in SAM.gov. Performance and payment bonds are required. Compliance with the Department of Labor Wage Determination (TN20260120) for Scott County, TN, is mandatory. Pre-construction submittals (work plan, safety plans, environmental plan, QC plan, coating procedures) are required before work commencement. Coordination with NPS and strict adherence to safety, environmental, and BISO food storage guidelines are essential.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: May 21, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: May 13, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 4, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 21, 2026
View