CAT 6 Premise Cable installation
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force, 911th Airlift Wing (AW) LGC, is soliciting quotes for CAT 6 Premise Cable installation at Building 419, Pittsburgh IAP ARS, Coraopolis, PA. This opportunity is a 100% Total Small Business Set-Aside for the engineering, furnishing, installation, and testing (EFI&T) of network cabling to support Wireless Access Points. Quotes are due Monday, March 9, 2026, at 9:00 a.m. EST.
Scope of Work
The contractor will provide all materials, labor, and incidentals to install 24 single drops of blue CAT 6 cable (T-568B) as home runs from user drops to patch panels, not exceeding 300 feet per run, terminating in female keystones. This includes mounting the rack and installing the patch panel (government provides APs, racks, patch panels, and patch cords). All new cable installations must be tested and certified to Category 6 specifications. The project requires strict adherence to environmental protection and occupational health safety (ESOH) protocols. The period of performance is 120 days from the date of award.
Contract Details
- Contract Type: Firm-Fixed-Price Purchase Order
- Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 238210 (Small Business Standard: $19.0 Million)
- Period of Performance: 120 days from date of award
- Evaluation: Lowest Price Technically Acceptable (LPTA)
- Offer Validity: Prices must be held firm for 30 calendar days from the offer due date.
Submission Requirements
Quotes must be submitted via email to ryan.scott.34@us.af.mil and crystal.spurlin@us.af.mil by Monday, March 9, 2026, at 9:00 a.m. EST. Required documents include:
- Price(s)
- FOB point
- Point of contact, name, and phone number
- Business size
- Completed FAR 52.212-3 and its ALT I (if not updated in SAM)
- Attachment #5 "Offer Pricing Template"
- Technical Capability Narrative demonstrating the ability to meet SOW requirements. Offerors must be registered in SAM.gov.
Key Clarifications from Q&A (Attachment 6)
- The government (Ops personnel) will install the 24-port patch panel and mount APs/Apple TVs. The vendor is responsible for running, labeling, and terminating CAT 6 cables with female keystones.
- Old cabling must be removed 48-72 hours after new installation and testing.
- Cable type (plenum vs. regular) depends on passage through HVAC systems; refer to SOW 3.2.8 and 8.1.
- No concrete core drills are anticipated, and wall plates/recessed installations are not required; cable drops will come directly from the drop ceiling.
- A grounding BUS bar is available for the wall-mounted rack.
Contacts
- Crystal Spurlin: crystal.spurlin@us.af.mil, 412-474-8893
- Ryan Scott: ryan.scott.34@us.af.mil, 412-474-8482