Boiler Replacement Service for the U.S. Embassy Riga, Latvia
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Department of State, through the U.S. Embassy Riga, is seeking professional services for the Boiler Replacement Service at the U.S. Embassy in Riga, Latvia. This Solicitation (19LG7526R0001) is for the removal and installation of two hot-water, floor-standing steel boilers. The contract will be Firm-Fixed-Price, with an estimated value between $100,000 and $250,000. Proposals are due March 18, 2026, at 2:00 PM local Riga time.
Scope of Work
The project involves the removal, disposal, and installation of two hot-water, floor-standing steel boilers with reverse-flame combustion chambers. Key specifications include:
- Quantity: Two boilers.
- Thermal Output: 630 kW per unit, with guaranteed thermal efficiency > 92%.
- Design: Floor-standing steel, reverse-flame configuration.
- Fuel: Dual-fuel capable (natural gas and light oil/#2 diesel) with low-NOx burners.
- Mandatory Items: Complete boiler package, factory-fitted low-NOx burner, electronic cam burner sequencing controller, combustion controller with Modbus interface, output modulator, and automatic O2 trim system.
- Re-design: Mechanical room re-design drawings are required.
- Testing: Factory acceptance tests (FAT), site commissioning, and performance acceptance testing.
- Documentation: Manufacturer's datasheets, performance curves, wiring diagrams, manuals, test certificates, and spare parts list.
- Quality: Equipment manufacturer must have ISO 9001 certification, meet regional safety/pressure-vessel standards. Certified subcontractors are required for gas, plumbing, fuel, and electrical work.
- Scope Clarification: The scope is limited to heating hot water, not domestic hot water.
Contract Details
- Contract Type: Firm-Fixed-Price.
- Period of Performance: Work to commence within 7 calendar days after Notice to Proceed and complete within 60 calendar days. This period is negotiable. Award is expected in approximately one month, with project commencement in June, contingent on security clearance.
- Estimated Value: $100,000 to $250,000.
- Warranty: Minimum 12 months parts and labor from commissioning (or 18 months from delivery).
- Bonds: Performance and payment bonds (20% of contract price) are required.
- Insurance: Local insurance is required; a DBA insurance waiver is not applicable.
Eligibility & Submission
- Eligibility: Offerors must be technically qualified, financially responsible, have a minimum of 5 years of boiler installation experience, an established business in Latvia (or plans to establish within 30 days of award), and be SAM registered. English proficiency (written and spoken) is required.
- Site Visit: A site visit was scheduled for February 24, 2026, at 2:30 PM.
- Proposal Submission Deadline: March 18, 2026, at 2:00 PM local Riga time.
- Submission Method: Electronically to Riga-ProcurementSection@state.gov. Files must be in MS-Word, MS-Excel, or Adobe Acrobat (pdf), not exceeding 30MB per file/email.
- Required Volumes: Volume I (SF 1442, Section K), Volume II (Price Proposal, Section B), Volume III (Performance schedule, Business Management/Technical Proposal).
- Evaluation Criteria: Award will be made to the lowest priced, technically acceptable, responsible offeror.
Key Clarifications
- BAS System: No specific brand required; it will control boiler room/mechanical room sensors independently using Modbus TCP protocol.
- Electrical Standards: Wiring must adhere to U.S. standards, with conduits provided by the Embassy.
- Boiler Standards: EU standards are preferred, with emphasis on local availability and maintainability of boilers and spare parts.
- Burner Type: Modular burner with electrical pilot flame ignition.
- Pumps: Primary and secondary pumps must be locally available, serviceable, and controlled by Variable Frequency Drive (VFD).
- Chimneys: Two chimney units, 300 mm ID, extending 6 meters above the roof.