Building 350 Chiller Replacement Phase II

SOL #: 6-S176-Q-00157-00Solicitation

Overview

Buyer

Energy
Energy, Department Of
ARGONNE NATL LAB - DOE CONTRACTOR
Lemont, IL, 60439, United States

Place of Performance

IL

NAICS

Other Professional Equipment and Supplies Merchant Wholesalers (423490)

PSC

Refrigeration Equipment (4110)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 16, 2026
2
Last Updated
Mar 3, 2026
3
Submission Deadline
Mar 1, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

Argonne National Laboratory is soliciting proposals for Building 350 Chiller Replacement Phase II, seeking a responsible contractor to furnish and install a water-cooled chiller with a variable speed, oil-free centrifugal compressor. This opportunity is for the pre-purchase of new chiller units compatible with existing systems. Proposals will be evaluated based on Lowest Price, Technically Acceptable (LPTA) criteria. Offers are due by March 1, 2026, at 5:00 PM CST.

Scope of Work

The project requires a new water-cooled chiller with a variable speed, oil-free centrifugal compressor for Building 350. The chiller must be fully and natively compatible with two existing modular chiller units, operating as a single integrated plant without additional gateways or custom programming. The scope includes delivery to Argonne National Laboratory, Building 046, and services such as manufacturer's authorized field start-up, controls integration, operator training, and commissioning assistance. The chiller must comply with detailed technical specifications, including ARI 550/590, ASHRAE 15, ASME, NFPA 70, UL 1995, and Green Seal GS-31 standards. Specific requirements for compressors, heat exchangers, insulation, accessories, microprocessor-based controls (BACnet MS/TP), and Variable-Frequency Drives (VFDs) are outlined. A one-year warranty for components and a five-year warranty for the compressor are required.

Contract & Timeline

  • Opportunity Type: Solicitation
  • Evaluation: Lowest Price, Technically Acceptable (LPTA)
  • Set-Aside: None specified
  • Questions Due: February 20, 2026
  • Offers Due: March 1, 2026, by 5:00 PM CST
  • Published Date: February 18, 2026
  • Place of Performance: Argonne National Laboratory, IL 60439, United States

Submission Requirements

Offerors must provide:

  • A completed and signed ANL-70 (Request for Quotation) and ANL-70B (Representations and Certifications).
  • An offeror-provided specification document demonstrating adherence to all mandatory technical requirements detailed in the "Building 350 Chiller Replacement Phase II" Specification Document dated January 12, 2026. Price information must not be included in this specification document.
  • Submittals including product data and shop drawings; bids without equipment submittals will be rejected. All offers must be returned to the Contracting Officer via email, with the Notice ID included in the subject line. An addendum has been incorporated into this solicitation.

Key Documents

  • Specification Document Building 350 Chiller Replacement Phase 2.pdf: Outlines detailed technical requirements, compatibility needs, quality standards, and services for the chiller.
  • J350-158-W-M0501.pdf (Chiller Schedule): Provides specific performance metrics, electrical data, sound power levels, and remarks (e.g., low GWP refrigerant, warranty, integration).
  • ANL-70B Reps and Certs Long-13-JAN-2025.PDF: Mandatory form for business organization, small business classifications, NAICS, FAR clause certifications, and personal conflict of interest.
  • Appendix A-71COM-22-OCT-2025.PDF: Argonne Terms and Conditions for Commercial Goods and Services, detailing legal and operational framework, FAR/DEAR clauses, and thresholds.
  • ANL-366H (on-site high risk)-01-OCT-2024.PDF: High Risk On-Site Supplemental Conditions, covering stringent safety, health, environmental protocols, indemnity, and insurance for on-site work.

Contact Information

Primary Contact: Molly Hunter (mollyhunter@anl.gov, 630-252-3094)

People

Points of Contact

Molly HunterPRIMARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 4
Solicitation
Posted: Mar 3, 2026
View
Version 3
Solicitation
Posted: Feb 26, 2026
View
Version 2Viewing
Solicitation
Posted: Feb 18, 2026
Version 1
Solicitation
Posted: Feb 16, 2026
View