Building 350 Chiller Replacement Phase II

SOL #: 6-S176-Q-00157-00Solicitation

Overview

Buyer

Energy
Energy, Department Of
ARGONNE NATL LAB - DOE CONTRACTOR
Lemont, IL, 60439, United States

Place of Performance

IL

NAICS

Other Professional Equipment and Supplies Merchant Wholesalers (423490)

PSC

Refrigeration Equipment (4110)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 16, 2026
2
Last Updated
Mar 3, 2026
3
Submission Deadline
Mar 10, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

Argonne National Laboratory, on behalf of the Department of Energy, is seeking a responsible contractor for the Building 350 Chiller Replacement Phase II project. This solicitation is for the procurement of a water-cooled chiller with a variable speed, oil-free centrifugal compressor for Building 350 in Argonne, IL. Offers are due by March 10, 2026, at 5:00 PM CST.

Scope of Work

The project requires a new chiller unit that is fully and natively compatible with two existing modular chiller units, operating as a single integrated chiller plant. The scope includes delivery of the unit to Building 046, manufacturer's authorized representative services for field start-up, controls integration, and operator training, and commissioning assistance.

Technical Requirements

Bidders must adhere to mandatory technical requirements outlined in the "Specification Document Building 350 Chiller Replacement Phase II" (dated January 12, 2026) and the "Chiller Schedule" (J350-158-W-M0501.pdf). These documents detail specific performance characteristics, electrical data, sound power levels, and compatibility needs (e.g., low GWP refrigerant, harmonic filters). Inability to meet these requirements may lead to removal from consideration. Chillers must comply with ARI 550/590, ASHRAE 15, ASME, NFPA 70, UL 1995, and Green Seal GS-31 standards. A one-year warranty for components and a five-year warranty for the compressor are required.

Contract & Timeline

  • Contract Type: Solicitation (for procurement of equipment).
  • Agency: Argonne National Laboratory (DOE Contractor), Department of Energy.
  • Evaluation: Lowest Price, Technically Acceptable (LPTA) criteria.
  • Questions Due: February 20, 2026.
  • Offer Deadline: March 10, 2026, by 5:00 PM CST.
  • Published Date: March 3, 2026.

Submission Requirements

Offerors must provide:

  • Completed and signed ANL-70 (Request for Quotation) and ANL-70B (Representations and Certifications) forms.
  • An offeror-provided specification document with evidence supporting all mandatory technical requirements (do not include price in this document).
  • Product data and shop drawings; bids without equipment submittals will be rejected.
  • Compliance with Argonne's "High Risk On-Site Supplemental Conditions" (ANL-366H) for safety, health, and environmental protocols, and "Appendix A - Argonne Terms and Conditions for Commercial Goods and Services."

Important Notes

Two addendums have been incorporated into this solicitation, including the updated offer deadline. All questions should be directed to the Contracting Officer, Molly Hunter (mollyhunter@anl.gov).

People

Points of Contact

Molly HunterPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Solicitation
Posted: Mar 3, 2026
Version 3
Solicitation
Posted: Feb 26, 2026
View
Version 2
Solicitation
Posted: Feb 18, 2026
View
Version 1
Solicitation
Posted: Feb 16, 2026
View
Building 350 Chiller Replacement Phase II | GovScope