Building 350 Chiller Replacement Phase II
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Energy's Argonne National Laboratory is seeking a contractor for Building 350 Chiller Replacement Phase II. This solicitation is for the procurement and installation of a water-cooled chiller with a variable speed, oil-free centrifugal compressor. The new chiller must be fully compatible with existing modular chiller units. Offers are due by March 10, 2026, 5:00 PM CST.
Scope of Work
This project involves furnishing a new chiller unit to be delivered to Argonne National Laboratory, Building 046. Key requirements include:
- Chiller Type: Water-cooled, variable speed, oil-free centrifugal compressor.
- Compatibility: Must be fully and natively compatible with two existing modular chiller units, operating as a single integrated chiller plant without additional gateways or custom programming.
- Technical Specifications: Adherence to mandatory technical requirements detailed in the "Specification Document Building 350 Chiller Replacement Phase II" (Jan 12, 2026) and the "Chiller Schedule" (J350-158-W-M0501.pdf). These include specific performance metrics, electrical data, sound power levels, and use of low GWP refrigerant.
- Services: Manufacturer's authorized representative must provide field start-up, controls integration, operator training, and commissioning assistance.
- Quality Assurance: Compliance with ARI 550/590, ASHRAE 15, ASME, NFPA 70, UL 1995, and Green Seal GS-31 standards.
- Warranty: One-year for components and five-year for the compressor.
Contract & Timeline
- Type: Solicitation
- Set-Aside: None specified
- Questions Due: February 20, 2026
- Offers Due: March 10, 2026, 5:00 PM CST
- Published: February 26, 2026 (Note: Two addendums have been incorporated, affecting the offer deadline).
Evaluation
Award will be based on Lowest Price, Technically Acceptable (LPTA) criteria. Offerors must demonstrate adherence to all mandatory technical requirements. Bids without required equipment submittals (product data and shop drawings) will be rejected.
Required Submissions
- Completed and signed ANL-70 and ANL-70B forms.
- Offeror-provided specification document with evidence supporting all mandatory technical requirements (do not include price).
- Product data and shop drawings.
Additional Information
Bidders should review the "High Risk On-Site Supplemental Conditions" (ANL-366H) for ES&H, indemnity, and insurance requirements, and "Appendix A - Argonne Terms and Conditions for Commercial Goods and Services" for contractual terms.