CA FLAP SCR T5(1A) – Monterey Bay Sanctuary Scenic Trail Mitigation

SOL #: 6982AF26R000002Combined Synopsis/Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
6982AF CENTRAL FEDERAL LANDS DIVISI
LAKEWOOD, CO, 80228, United States

Place of Performance

Santa Cruz, CA

NAICS

Forest Nurseries and Gathering of Forest Products (113210)

PSC

Forest Tree Planting Services (F005)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 14, 2026
2
Last Updated
May 29, 2026
3
Submission Deadline
Jun 5, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (Department of Transportation) is soliciting proposals for the CA FLAP SCR T5(1A) – Monterey Bay Sanctuary Scenic Trail Mitigation project in Santa Cruz, CA. This Total Small Business Set-Aside opportunity involves comprehensive mitigation site restoration and enhancement, including a five-year maintenance period. Proposals are due June 5, 2026, at 2:00 P.M. MDT.

Scope of Work

This project focuses on mitigation site restoration and enhancement for the Monterey Bay Sanctuary Scenic Trail. Key tasks include selective clearing, site grading (approximately 5,860 square yards), fencing, gate installation, and various labor services (dump truck, backhoe, wheel loader, general, technical, survey, and biological services). A significant component involves seeding, mulching, and plantings, followed by a five-year maintenance period.

The contractor will be responsible for determining water sources and providing irrigation methods for plants throughout the maintenance period. Soil disposal areas are indicated on Plan Sheet D1. Planting and seed mixes must comply with specifications (Sections 625.03 and 626.03), with specific requirements for local seed collection for the Palustrine Emergent Wetland, though commercial substitutions may be considered under certain conditions. Existing corrals (RFR-6) are not to be removed, and plantings/fence layouts should adjust accordingly. The contractor is also responsible for surveying and providing biological monitoring services.

Contract Details

  • Contract Type: Firm Fixed Price
  • Period of Performance: Upon award, extending five years to include the maintenance period.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 113210 – Forest Nurseries and Gathering Forest Product, with a size standard of $20.5 million.
  • Place of Performance: Santa Cruz, CA, United States.

Submission & Evaluation

Proposals must be submitted electronically as Adobe (PDF) files and include a Technical Proposal, Price Proposal, Past Performance References (last six years), and Organizational Information. Proposals must remain valid for a minimum of 60 days. Evaluation will consider technical and past performance as approximately equal to cost or price. Offerors must be registered in SAM.gov at the time of proposal submission.

Key Amendments & Clarifications

  • Amendment A004 (May 29, 2026) extended the response due date to June 5, 2026, 2:00 P.M. MDT. It also replaced Plan Sheet C4 and RFP Part 1, Section C (pages C-1 through C-88).
  • Amendment A001 (April 28, 2026) replaced Section D, "CONTRACT CLAUSES."
  • Questions & Answers documents (latest posted May 29, 2026) provided extensive clarifications on water sourcing, grading, planting specifications (including local vs. commercial seed, 70% native plant cover as relative), fencing, and bonding requirements. Performance and Payment bonds must cover the entire award, including the five-year maintenance period, with annual renewable bonds not permitted for the full term. A hard copy of the bid bond is required.
  • A virtual pre-proposal meeting was held on April 21, 2026.

Contact Information

For inquiries, contact Kelly Palmer at cflacquisitions@dot.gov.

People

Points of Contact

Kelly PalmerPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 9Viewing
Combined Synopsis/Solicitation
Posted: May 29, 2026
Version 8
Combined Synopsis/Solicitation
Posted: May 21, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: May 20, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: May 8, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: May 6, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 24, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 14, 2026
View
CA FLAP SCR T5(1A) – Monterey Bay Sanctuary Scenic Trail Mitigation | GovScope