CES Cross-Connection Survey

SOL #: FA462026QA210Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4620 92 CONS LGC
FAIRCHILD AFB, WA, 99011-5320, United States

Place of Performance

Fairchild AFB, WA

NAICS

Environmental Consulting Services (541620)

PSC

Water Quality Studies (B533)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 14, 2026
2
Last Updated
May 7, 2026
3
Submission Deadline
May 5, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for a CES Cross-Connection Survey at Fairchild Air Force Base, WA. This is a Total Small Business Set-Aside to protect potable water from contamination and ensure regulatory compliance. Proposals are due May 5, 2026, at 10:00 AM PT.

Purpose & Scope

The objective is to conduct a comprehensive cross-connection survey of Fairchild AFB's water system, including transmission, distribution lines, and in-premise protection, as well as Geographically Separated Units (GSUs). The contractor will inspect external and internal water system components, evaluate the adequacy of existing backflow prevention devices (BFDs) for compliance (physical evaluation not required), and identify deficiencies. The survey excludes Balfour Beatty-contracted housing units.

Key Requirements & Deliverables

  • Conduct physical observation and survey of the entire premise.
  • Identify actual or potential cross-connections and recommend corrective actions.
  • The team lead must hold Washington State certifications in cross-connection control and backflow prevention (USC FCCCHR certifications are not accepted).
  • Adhere to OSHA standards and installation-specific safety protocols.
  • Deliverables include a Preliminary Survey Report (within 45 days of survey completion) and a Final Report (within 90 days of survey completion), detailing deficiencies, risk levels, BFD assessments, corrective action recommendations with cost estimates, and annotated maps.

Contract Details & Timeline

  • Contract Type: Firm-Fixed-Price
  • Period of Performance: Survey execution from July 1, 2026, to September 30, 2026.
  • Set-Aside: Total Small Business (NAICS: 541620 "Environmental Consulting Services")
  • Proposal Due: May 5, 2026, at 10:00 AM PT
  • Place of Performance: Fairchild AFB, WA

Submission & Evaluation

  • Offers must be submitted via email to SSgt Nicholas Guagliardo and Ms. Kathleen Rauch.
  • Evaluation factors include Price and SPRS (Supplier Performance Risk System). The government intends to award without discussions and reserves the right to award to other than the lowest-priced offeror.
  • All prospective offerors must be registered and active in SAM.

Important Dates & Contacts

  • Site Visit: April 22, 2026, at 11:00 AM PT (Fairchild AFB, Building 2451, Suite 200). Only U.S. citizens allowed.
  • Questions Due: April 28, 2026, at 10:00 AM PT.
  • Primary Contact: Nicholas M. Guagliardo (nicholas.guagliardo@us.af.mil, 509-247-2236)
  • Secondary Contact: Kathleen L. Rauch (kathleen.rauch@us.af.mil, 509-247-4865)

Attachments

Key attachments include the Revised Statement of Work (SOW REV1), Revised Combined Synopsis/Solicitation (COMBO REV1), Wage Determination 2015-5537 Rev 27, Air Force Specific Terms and Conditions, and various appendices detailing inventory, maps, and connections lists.

People

Points of Contact

Nicholas M. GuagliardoPRIMARY
Kathleen L. RauchSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: May 7, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: May 5, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Apr 27, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Apr 22, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 14, 2026
View