CNC 5 Axis Gantry Mill
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army is soliciting quotations for one (1) Computer Numerically Controlled (CNC) 5 Axis Gantry Mill for Letterkenny Army Depot (LEAD) in Chambersburg, PA. This acquisition is a Total Small Business Set-Aside and includes turnkey installation and associated services. Quotations are due by May 22, 2026, at 1200 Eastern Time.
Scope of Work
The requirement is for the purchase, delivery, and turnkey installation of a CNC 5 Axis Gantry Mill. This includes all necessary professional architectural, engineering, and construction services for site preparation, design, fabrication, installation, and testing. The contractor will also be responsible for preparing and delivering Contract Data Requirements Lists (CDRLs) A001 - A008.
Key Requirements
The proposed 5-axis Gantry Mill must meet specific entry gate criteria, including:
- Machine Capabilities: Simultaneous 5-axis operations, 80-tool magazine with load/unload arm, controls accepting off-site programs via network, compatibility with MASTERCAM26, and provision of a post-processor.
- Performance: At least 80hp spindle power, 0-12,500 RPM spindle speed, 60,000 lb machining table capacity, and linear encoders on X, Y, and Z Axes.
- Dimensions: Machining envelope of at least 169" L x 123" W x 50" H, maximum tool diameter of 4.9 inches, and a footprint no larger than 73' L x 27' W.
- Features: Chip-Conveyor with Coolant Management, 19-inch minimum color LCD display, Ethernet connection, and emergency shutdown buttons. Additional consideration will be given to offers exceeding these requirements, such as HSK 100 spindle, Renishaw RMP60/RTS, FANUC control, multiple chip conveyors, larger LCD, replaceable two-head design, and a smaller footprint.
Contract & Timeline
- Type: Combined Synopsis/Solicitation (Request for Quotation - RFQ)
- Set-Aside: Total Small Business
- NAICS: 333517 - Machine Tool Manufacturing
- PSC: 3417 – Milling Machines
- Place of Performance: Letterkenny Army Depot, Chambersburg, PA
- Quotation Due: May 22, 2026, at 1200 Eastern Time
- Anticipated Award Date: June 30, 2026
- F.O.B. Point: Destination
- Warranty: Standard commercial or full one-year (parts, labor, shipping, travel), whichever is greater.
Evaluation Criteria
Award will be made to the responsible offeror whose quotation is most advantageous to the Government, considering Technical, Past Performance, and Price.
- Technical: Offerors must demonstrate compliance with all Purchase Description requirements, provide a detailed breakdown of specifications, a structured preventive maintenance plan (including technician distance, response time, warranty, parts origin/availability), and testing/training plans. Offers must meet all entry gate criteria to proceed.
- Past Performance: Evaluated based on relevant Government and commercial contracts within the past three years.
- Price: Offerors must propose on all items. Award may be made to other than the lowest price if technical merit warrants.
Submission Instructions
Quotations must be submitted via email to Contract Specialist Danielle Rhone (danielle.r.rhone.civ@army.mil) and Contracting Officer Thomas Hall (thomas.c.hall111.civ@army.mil) by the deadline. The Government intends to award without discussions, so offerors should submit their best prices initially. Questions must be submitted in writing at least five calendar days prior to the closing date.
Additional Notes
A site visit was held on April 23, 2026. All contractor personnel accessing the installation must comply with strict security requirements, including Real ID compliance for site access, background checks, and various mandatory training. Payment will be made via Electronic Funds Transfer (EFT) using Wide Area Work Flow (WAWF).