- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Air Force has issued a Solicitation for the CNS Finished Water Tank project (QUUG 19-1003) at Morón Air Base, Spain. This opportunity involves the design and construction of an 800,000-gallon (approximately 3,029 m³) elevated potable water storage tank. The estimated project magnitude is between $1,000,000 and $5,000,000 USD. This solicitation is intended only for local sources normally resident, licensed, and registered to conduct construction business in Spain. Bids are due by May 7, 2026, at 1200 hours local time.
Scope of Work
The project encompasses the complete design and construction of an elevated water tank to meet fire fighting and three-day self-sustaining water storage requirements. Key work areas include:
- Civil Works: Demolition and installation of exterior fencing, trenching for utilities, new drainage system, and access road construction.
- Structural Works: Reinforced concrete footings, bracing beams, and a galvanized metal structure to support the tank, including ladders and handrails.
- Architectural Work (Building #558): Selective demolition, new steel door, brick partitions, and fall arrestor system.
- Mechanical Works: Provision and installation of the 800KGal cylindrical tank, underground potable water piping, a dosing system (chlorination and pH control), and an elevator.
- Electrical Works: Underground electrical distribution, interior and exterior lighting, lightning protection, a new 10 kVA dry transformer, and a cathodic protection system for the tank's interior.
- Miscellaneous Works: Provision and coordination of a SCADA control system for the new and existing water systems, repair of affected elements, final cleaning, and testing of all installed equipment.
- Compliance: Work must comply with Spanish legislation for government works, and Spanish material, labor, and equipment should be used whenever feasible.
Contract & Timeline
- Contract Type: Firm Fixed Price.
- Estimated Magnitude: $1,000,000 - $5,000,000 USD.
- Period of Performance: 365 calendar days from the Notice to Proceed.
- Eligibility: Local sources only, defined as companies resident, licensed, and registered to conduct construction business in Spain. Offers from non-local sources will not be considered.
- Pre-proposal Conference/Site Visit: April 20, 2026, at 1300 hours local time, in the Contracting Conference room, bldg 106. RSVP required 24 hours prior; escort requests 72 hours prior.
- Questions Due: April 27, 2026.
- Bids Due: May 7, 2026, by 1200 hours local time.
Evaluation
Offers will be evaluated according to criteria in Section M, with award based on price and price-related factors to the lowest responsive bidder. Bids must adhere to all requirements in Section L; nonconforming bids will not be accepted or evaluated.
Additional Notes
A Bank Letter of Guarantee is required within ten (10) calendar days after contract award. Funds are not presently available within USAFE to fund this project; bid acceptance period should be valid through December 31, 2025. The Government reserves the right to cancel this solicitation. Bidders must use the provided "Attachment 4 - Cost Estimate-Blank.xlsx" for their detailed cost proposal. Environmental compliance is critical, with "Attachment 6 - Integrated Natural Resources Management Plan" and "Attachment 7 - Environmental Final Governing Standards" providing essential context for operations at Morón Air Base.