Cross Arm Replacement DSCR

SOL #: SP4703-26-Q-0025Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DCSO RICHMOND DIVISION #1
RICHMOND, VA, 23237, United States

Place of Performance

VA

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Electric Wire, And Power And Distribution Equipment (J061)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 23, 2026
2
Last Updated
May 8, 2026
3
Submission Deadline
May 23, 2026, 3:59 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA) is soliciting quotes for Cross Arm Replacement services at DLA Installation Management Richmond, VA. This is a Firm Fixed-Price (FFP) contract, procured as a Total Small Business Set-Aside. The acquisition aims to replace aged and deteriorated cross arms on specific power poles to ensure the safety and reliability of the electrical distribution system. Quotes are due by May 22, 2026, at 11:59 PM EST.

Scope of Work

The contractor will replace cross arms, including cutouts and lightning arresters, on power poles 607, 608, 609, 610, 611, 612, 613, 614, 615, 616, 617, 618, and 621 located on South Second Street and G Road at the Defense Supply Center Richmond (DSCR). Tasks include:

  • Conducting on-site assessments.
  • Removing existing cross arms, insulators, bolts, and hardware.
  • Installing new cross arms, insulators, and hardware per industry standards.
  • Removing all old materials and debris, restoring the worksite.
  • Performing a final inspection with the project manager. Work will be performed de-energized on Saturdays only, requiring 14 calendar days' advance notice for power outages.

Contract Details

  • Contract Type: Firm Fixed-Price (FFP)
  • Period of Performance: 180 days from notice to proceed.
  • Estimated Magnitude: Between $25,000.00 and $100,000.00.
  • NAICS Code: 238210 (Electrical Contractors and Other Wiring Installation Contractors)
  • Small Business Size Standard: $19 Million
  • Wage Determination: Department of Labor Wage Determination Number 2015-4313 Revision 31 applies.

Key Requirements & Qualifications

  • Set-Aside: Total Small Business.
  • Experience: Contractor must have 5 years of high voltage experience.
  • Location: Contractor must own, possess, or control a bona fide place of business within 125 miles of Defense Supply Center Richmond.
  • Registration: Must be registered in the System for Award Management (SAM.gov) at the time of quote submission.
  • Proposal Content: Proposals must include a project narrative, projected timeline, list of definable features of work, previous relevant project experience (minimum 5 projects within the last 5 years with award amounts, descriptions, and POCs), and POC information. Partial proposals will not be accepted.

Submission & Evaluation

  • Submission Method: Proposals should be submitted via email to Contract Specialist Corinne Kuge (Corinne.Kuge@dla.mil).
  • Evaluation Criteria: Lowest Priced Technically Acceptable (LPTA).
  • Quote Due Date: May 22, 2026, at 11:59 PM EST.
  • Site Visit: A site visit was held on April 29, 2026.
  • Points of Contact:

People

Points of Contact

Robert Moragues, Contracting OfficerSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Combined Synopsis/Solicitation
Posted: May 8, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 14, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 23, 2026
View