CUSTER GALLATIN NATIONAL FOREST - Riley Pass Bluff B Mine Waste Excavation Project

SOL #: 1240LU26Q0020Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
CUSTER GALLATIN NATIONAL FOREST
BOZEMAN, MT, 59715, United States

Place of Performance

SD

NAICS

Remediation Services (562910)

PSC

Repair Or Alteration Of Restoration Of Real Property (Public Or Private) (Z2QA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 22, 2026
2
Last Updated
Feb 24, 2026
3
Submission Deadline
Mar 3, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service, Custer Gallatin National Forest is soliciting quotes for the Riley Pass Bluff B Mine Waste Excavation Project in Harding County, South Dakota. This Total Small Business Set-Aside opportunity involves excavating and consolidating historic mine waste. Quotes are due March 3, 2026, at 4:00 PM Mountain Time.

Project Scope

This project requires the excavation of historic mine waste at various locations on Bluff B and its placement and compaction into designated consolidation areas. Key tasks include:

  • Site preparation, grading, and construction of roadways.
  • Implementation of erosion control measures and dust suppression.
  • Turf establishment using Sterile Rye seeding.
  • Placement of aggregate courses.
  • Mine waste excavation requires GPS-controlled equipment.
  • Personnel must have OSHA 40-hour HAZWOPER training.
  • The project site features steep slopes (up to 70%), requiring a submitted haul plan and ingress/egress from the bluff top.

Contract Details

  • Contract Type: Firm-Fixed-Price Request for Quotation (RFQ).
  • NAICS Code: 562910 (Remediation Services), Size Standard: 1,000 employees.
  • Set-Aside: Total Small Business.
  • Period of Performance: Non-seeding work must be completed by July 1, 2026. Seeding must occur by June 15, 2026, or between September 15 – October 15, 2026. No extensions will be granted.
  • Bonds: A 20% bid guarantee is required for quotes exceeding $150,000. Performance and Payment Bonds (100% of contract price) are required for contracts over $150,000, due 10 days post-award. Payment protections are required for contracts between $35,000 and $150,000.
  • Wage Rates: Davis-Bacon Act prevailing wage rates for South Dakota Heavy and Highway Construction apply.

Submission Requirements & Evaluation

Quoters must submit:

  • A completed Schedule of Items with pricing.
  • A document demonstrating recent and relevant experience and past performance (narrative limited to 10 pages).
  • A bid guarantee (if applicable).
  • Acknowledgment of all amendments. Evaluation will be based on Best Value to the Government, considering the relevancy, size, complexity, type of work, recency, and quality of experience and past performance.

Key Dates & Contact

  • Questions Due: February 23, 2026, 12:00 PM Mountain Time.
  • Quotes Due: March 3, 2026, 4:00 PM Mountain Time.
  • Contact: Alisha Knaub, alisha.knaub@usda.gov, (406)438-2981.

Amendments & Clarifications

Amendment 001 (Feb 11, 2026) added site photos and clarified excavation quantities, narrative page limits, and working hour restrictions. The latest Q&A (Feb 18, 2026) further confirmed these details, including firm completion dates and site access protocols. Work is generally restricted to weekdays, with no night work.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Combined Synopsis/Solicitation
Posted: Feb 24, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Feb 23, 2026
View
Version 5Viewing
Combined Synopsis/Solicitation
Posted: Feb 18, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Feb 17, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Feb 3, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 3, 2026
View
Version 1
Sources Sought
Posted: Jan 22, 2026
View