Demolition of Sites 50 and 55 - Request for Proposal
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Energy (DOE), through Fermi National Accelerator Laboratory (Fermilab), is soliciting proposals for the Demolition of Sites 50 and 55 in Batavia, IL. This is a Total Small Business Set-Aside for a Firm Fixed-Price contract. The project involves the complete demolition of two houses, including utility termination, backfilling, and site restoration. Proposals are due by February 27, 2026, at 3:00 PM CST.
Scope of Work
The selected subcontractor will perform all work for the demolition of Site 50 and Site 55 houses as defined in the Statement of Work (Exhibit A) and associated drawings (Exhibit B). This includes:
- Demolition and complete removal of structures, foundations, and hardstands to 18 inches below grade.
- Proper termination or rerouting of existing utilities.
- Backfilling with suitable soil material and site restoration, including seeding.
- Furnishing all required supervision, labor, materials, tools, transportation, overhead, bonding, insurance, safety oversight, and quality control.
- Compliance with drawing set "13-1-69_Demo GPP_Final Design" dated September 23, 2025, and project manual specifications.
Contract Details
- Contract Type: Firm Fixed-Price, competitive Lowest Price Technically Acceptable (LPTA) procurement.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- Product Service Code: P400 (Demolition Of Buildings).
- NAICS Code: 238910 (Site Preparation Contractors) with a $19.0 million size standard.
- Period of Performance: Milestone 0 (Notice to Proceed) is Calendar Day 0; Milestone 1 (Project Complete, closeout documents approved) is Calendar Day 154.
Key Requirements & Deliverables
- Bonds: A Bid Guarantee (not less than 20% of bid price, max $3M) is required. Payment Bond (if subcontract >$35K) and Performance Bond (if subcontract >$150K) are also required.
- Insurance: Comprehensive insurance coverage as detailed in Exhibit I.
- Quality Control: Subcontractors must submit a Corporate Quality Assurance Plan with their bid/proposal and a Project Quality Control Plan post-award (Exhibit F, T).
- ES&H: Strict Environment, Safety, and Health requirements must be met (Exhibit D).
- Submittals: Adherence to detailed submittal procedures for shop drawings, O&M manuals, etc. (Exhibit E).
- Wage Rates: Compliance with prevailing wage rates per General Decision IL20250008 (Exhibit R).
Submission & Evaluation
- Submission: Proposals must be emailed to Gina M. Kern (ginakern@fnal.gov).
- Evaluation: Technical proposals (Corporate Capabilities, Current/Past Experience, Key Personnel Experience, Safety Documentation, Corporate Quality Assurance Plan) will be evaluated on an acceptable/unacceptable basis. Price proposals will be evaluated for the lowest price among technically acceptable offers.
Important Dates
- Pre-Proposal Meeting & Site Visit: February 11, 2026, at 9:30 AM CST. Participants must wear a hard hat and steel-toe boots. Access requires submitting information 5 days prior.
- Questions Due: February 13, 2026, at 5:00 PM CST, submitted in writing to ginakern@fnal.gov.
- Proposal Due: February 27, 2026, at 3:00 PM CST.
Contact Information
- Primary Contact: Gina M. Kern, ginakern@fnal.gov, 630-840-3955.