DISA-PAC VIDEO WALL
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Defense Information Systems Agency (DISA) / DITCO-PAC has released Solicitation HC1019-25-R-0007 for a Total Small Business Set-Aside to procure, install, program, and test two new LED video walls and associated IT products at DISA-PAC, Pearl Harbor, Hawaii. This effort, a "DNC PAC Video Wall Tech Refresh," replaces a previously canceled solicitation. Proposals are due May 13, 2026, NLT 10:00 am HST.
Scope of Work
The contractor will be responsible for the full lifecycle of the video wall refresh, including:
- Procurement of two new LED video walls, two video processors, and associated A/V equipment and cabling.
- Removal and disposal of existing video walls.
- Installation, labeling, programming assistance for the control system (transitioning to Extron), and comprehensive testing of the new A/V system.
- Provision of a 12-month warranty on the system and installation.
- Personnel performing on-site work must possess interim or final SECRET clearance.
- Products must meet salient characteristics, with specific Extron components (Four Output Board, XTP Fiber Optic Transmitter) being brand-name limited for compatibility with existing Extron matrix switches.
- Post-installation support includes 8x5 telephone helpdesk, remote engineering support, and on-site response within 8 business hours for trouble calls.
- Maintenance of an off-site inventory of spare parts (15% Video Modules, 10% Other Parts).
Contract Details
- Type: Combined Synopsis/Solicitation (implied Firm Fixed-Price for commercial items).
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- NAICS: 334310, Size Standard: 750 employees. A Non-Manufacturer Rule waiver is included.
- Period of Performance: 12 months from contract award for installation, followed by a one-year installation warranty.
- Place of Performance: DISA-PAC, Pearl Harbor, Hawaii (JBPHH, HI).
Submission & Evaluation
- Proposal Due Date: Wednesday, May 13, 2026, NLT 10:00 am HST.
- Submission Method: Electronic.
- Evaluation: Lowest Price Technically Acceptable (LPTA) process. Proposals require a Technical/Management Approach (limited to 10 pages) and a Price Quote.
- Evaluation Factors: Technical/Management Approach (subfactors: Tech Refresh, Warranty, rated Acceptable/Unacceptable) and Price. Past performance will be used for determining contractor responsibility.
- Required Attachments: Bidders must utilize the provided Price Quote Worksheet, which details CLINs for material, installation, travel, and warranty, requiring specific breakdowns for costs and labor.
Additional Notes
This is a new requirement, not a continuation of an incumbent contract. No site visit is scheduled. Q&A documents have clarified technical details regarding mounting surfaces, cable pathways, and the control system transition.