Dismantling and Disposal of Satellite Dishes USAGM Kuwait Transmitting Station.
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The United States Agency for Global Media (USAGM) is soliciting proposals for the dismantling, removal, and disposal of seven (7) satellite dishes and associated electrical infrastructure at the USAGM Kuwait Transmitting Station. This is a Combined Synopsis/Solicitation for commercial items. Proposals are due February 27, 2026, at 12:00 PM EST.
Scope of Work
The requirement involves the complete dismantling of seven satellite dishes, including their mounts and associated components. This also includes the removal of all associated electrical cables, conduits, trays, supports, and accessories. Contractors must trim and level all stud bolts flush with the concrete foundation surface. All removed materials must be transported and disposed of in accordance with applicable Kuwait environmental regulations. The work area must be restored to a clean and safe condition. Specific satellite dish models and manufacturers (Vertex Communication Corporation) have been provided.
Contract Details
- Contract Type: Firm Fixed Price
- Period of Performance: Thirty (30) calendar days after Notice to Proceed (NTP).
- Set-Aside: None specified.
- NAICS Code: 238910 (Repair Or Alteration Of Other Non Building Facilities) with a small business size standard of $19,000,000.00.
- Bonding: Performance and Payment Bonds are not applicable to this requirement.
Submission & Evaluation
Proposals must be submitted via email in PDF format, consisting of two separate attachments: a Technical Proposal and a Price Proposal. The total size of all attachments must not exceed 23MB. Offerors must be registered and "ACTIVE" in the SAM database prior to contract award. Evaluation factors include Compliance, Technical Knowledge and Capabilities, Past Performance, and Price. Non-price factors combined are considered significantly more important than price.
Key Clarifications & Amendments
- Proposal Due Date: Extended to February 27, 2026, at 12:00 PM EST (latest amendment A00003).
- Site Visit: An additional site visit was scheduled for February 17, 2026.
- Electrical Cable Removal: Cables are routed through sleeves; asphalt cutting is not required.
- Concrete Demolition: No concrete demolition is specified for existing pedestals or slabs; foundations are to remain.
- Disposal: Contractors are responsible for compliant disposal per Kuwait regulations; disposal certificates are not a specified deliverable.
- Work Hours: Standard work hours are 0700–1500, Sunday through Thursday.
- Security: Security clearance is mandatory for all contractor personnel.
- Offerors must acknowledge receipt of all amendments.