Everglades National Park, Flamingo Marina Bulkhead Rehabilitation Monroe County, Florida

SOL #: W912EP25RA006Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W074 ENDIST JACKSNVLLE
JACKSONVILLE, FL, 32207-0019, United States

Place of Performance

Homestead, FL

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Maintenance Of Recreation Facilities (Non Building) (Z1PA)

Set Aside

No set aside specified

Timeline

1
Posted
Sep 24, 2025
2
Last Updated
Mar 10, 2026
3
Submission Deadline
Mar 5, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, USACE Jacksonville District, is soliciting proposals for the Everglades National Park, Flamingo Marina Bulkhead Rehabilitation project in Monroe County, Florida. This Unrestricted (Full and Open), Firm-Fixed-Price (FFP), Design-Bid-Build contract has an estimated magnitude between $25,000,000 and $100,000,000. The project involves comprehensive rehabilitation of the marina's bulkhead walls and associated infrastructure. Proposals are due March 5, 2026.

Scope of Work

The project entails the removal of existing concrete bulkhead caps and installation of new steel sheet pile walls with cast-in-place concrete caps and precast concrete wall panels. Additional work includes site grading, replacement and addition of mechanical, plumbing, and electrical equipment, and storm water outfall pipe extensions. The scope also covers the removal and replacement of asphalt/concrete pavement, timber guide and mooring piles, floating docks, aluminum ramps, and modification of fixed docks. Work will be conducted within and around the four marina basins (Whitewater Bay, Florida Bay, Visitor Center Bay, and Maintenance Marina Bay) at the Flamingo Marina. Shallow draft barges are authorized, provided no dredging is required. The project consists of a base and six options.

Contract & Timeline

  • Contract Type: Firm-Fixed-Price (FFP), Design-Bid-Build
  • Set-Aside: Unrestricted (Full and Open)
  • NAICS Code: 237990 (Other Heavy and Civil Engineering Construction)
  • Magnitude: $25,000,000 - $100,000,000
  • Period of Performance: 1,350 calendar days from Notice to Proceed
  • Proposal Due: March 5, 2026, 7:00 PM UTC
  • Published: March 3, 2026

Evaluation & Submission

This acquisition will utilize a Best Value Tradeoff Source Selection Process in accordance with FAR Part 15. Evaluation factors include:

  • Technical Merit: Technical Approach Plan and Management Plan.
  • Past Performance: Company Specialized Experience Form and NAVFAC/USACE PPQ or CPARS.
  • Small Business Participation: Proposed Small Business Participation Plan and past utilization (for large businesses, a Subcontracting Plan is required).
  • Price: For reasonableness. The Project Labor Agreement (PLA) requirement has been removed. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. All inquiries must be submitted in writing via ProjNet.

Additional Notes

Significant environmental and ecological concerns require protection measures for West Indian Manatees, Smalltooth Sawfish, and American Crocodiles. Construction considerations include limited access, phased construction, and potential for existing bulkhead failure. Compliance with EM 385-1-1 Safety and Health Requirements Manual and a Contractor Quality Control Plan are mandatory. A pre-bid site visit was held, and its sign-in roster is available, which may help identify potential partners or competitors.

People

Points of Contact

Ireishal AdamsPRIMARY
William WallaceSECONDARY

Files

Files

Download
Download
View
View
View
View

Versions

Version 26
Solicitation
Posted: Mar 10, 2026
View
Version 25
Solicitation
Posted: Mar 3, 2026
View
Version 24Viewing
Solicitation
Posted: Mar 3, 2026
Version 23
Solicitation
Posted: Feb 4, 2026
View
Version 22
Solicitation
Posted: Dec 17, 2025
View
Version 21
Solicitation
Posted: Dec 3, 2025
View
Version 20
Solicitation
Posted: Dec 3, 2025
View
Version 19
Solicitation
Posted: Dec 1, 2025
View
Version 18
Solicitation
Posted: Dec 1, 2025
View
Version 17
Solicitation
Posted: Dec 1, 2025
View
Version 16
Solicitation
Posted: Nov 24, 2025
View
Version 15
Solicitation
Posted: Nov 24, 2025
View
Version 14
Solicitation
Posted: Nov 12, 2025
View
Version 13
Solicitation
Posted: Nov 10, 2025
View
Version 12
Solicitation
Posted: Nov 10, 2025
View
Version 11
Solicitation
Posted: Oct 2, 2025
View
Version 10
Solicitation
Posted: Oct 2, 2025
View
Version 9
Solicitation
Posted: Oct 2, 2025
View
Version 8
Solicitation
Posted: Oct 1, 2025
View
Version 7
Solicitation
Posted: Oct 1, 2025
View
Version 6
Solicitation
Posted: Oct 1, 2025
View
Version 5
Solicitation
Posted: Sep 25, 2025
View
Version 4
Solicitation
Posted: Sep 25, 2025
View
Version 3
Solicitation
Posted: Sep 24, 2025
View
Version 2
Solicitation
Posted: Sep 24, 2025
View
Version 1
Solicitation
Posted: Sep 24, 2025
View