Everglades National Park, Flamingo Marina Bulkhead Rehabilitation Monroe County, Florida

SOL #: W912EP25RA006Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W074 ENDIST JACKSNVLLE
JACKSONVILLE, FL, 32207-0019, United States

Place of Performance

Homestead, FL

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Maintenance Of Recreation Facilities (Non Building) (Z1PA)

Set Aside

No set aside specified

Timeline

1
Posted
Sep 24, 2025
2
Last Updated
Mar 10, 2026
3
Submission Deadline
Nov 14, 2025, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army / USACE Jacksonville District is soliciting proposals for the Everglades National Park, Flamingo Marina Bulkhead Rehabilitation project in Monroe County, Florida. This Unrestricted (Full and Open), Firm-Fixed-Price contract, valued between $25,000,000 and $100,000,000, involves extensive rehabilitation of marina infrastructure. Proposals are due March 19, 2026.

Scope of Work

The project entails the removal of existing concrete bulkhead caps and installation of new steel sheet pile bulkhead walls with cast-in-place concrete caps and precast concrete wall panels. Work also includes site grading, mechanical, plumbing, and electrical equipment replacements and additions, stormwater outfall pipe extensions, and the removal and replacement of asphalt/concrete pavement, timber guide/mooring piles, floating docks, and aluminum ramps. Modifications to fixed docks are also required.

This effort spans four marina basins: Whitewater Bay, Florida Bay, Visitor Center Bay, and Maintenance Marina Bay. Key requirements include installing 3,864 linear feet of sheet pile wall, flowable fill placement, and replacing utility pedestals, dock panels, sewage pumps, fuel dispensers, and electrical systems. Construction must primarily be landside, with specific environmental protections for West Indian Manatees, Smalltooth Sawfish, and American Crocodiles.

Contract Details

  • Type: Firm-Fixed-Price (FFP) contract, consisting of a base and six options.
  • Acquisition Method: Design-Bid-Build, utilizing a Best Value Tradeoff Source Selection Process in accordance with FAR 15.
  • NAICS Code: 237990 (Other Heavy and Civil Engineering Construction).
  • Small Business Standard: $45,000,000.00.
  • Construction Magnitude: Between $25,000,000 and $100,000,000.
  • Set-Aside: Unrestricted (Full and Open) competitive procurement. All responsible offerors are encouraged to participate.
  • Period of Performance: 1,350 calendar days from the issuance of Notice to Proceed.
  • Project Labor Agreement (PLA): The PLA requirement has been removed.

Evaluation Factors

Proposals will be evaluated based on:

  • Technical Merit (Technical Approach Plan, Management Plan).
  • Past Performance (Company Specialized Experience Form, NAVFAC/USACE PPQ or CPARS).
  • Small Business Participation (Proposed Small Business Participation Plan).
  • Price (for reasonableness).

Submission & Deadlines

  • Proposals Due: March 19, 2026, by 6:00 PM UTC.
  • Submission Method: Electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module (https://piee.eb.mil/). No other transmission methods will be accepted.
  • Inquiries: All inquiries must be submitted in writing via ProjNet. Instructions are provided in the solicitation.
  • Registration: Interested vendors must register as an interested vendor on sam.gov and be registered in SAM to receive an award.
  • Point of Contact: Ireishal Adams (Ireishal.C.Adams@usace.army.mil) and William Wallace (William.J.Wallace@usace.army.mil).

Additional Notes

Construction considerations include limited access, phased construction, and potential for existing bulkhead failure. Safety requirements mandate compliance with EM 385-1-1, an Accident Prevention Plan, Activity Hazard Analysis, and Traffic Control Plans. Quality requirements include a Contractor Quality Control Plan and a Three Phase Control System.

People

Points of Contact

Ireishal AdamsPRIMARY
William WallaceSECONDARY

Files

Files

View
View
View
View

Versions

Version 26
Solicitation
Posted: Mar 10, 2026
View
Version 25
Solicitation
Posted: Mar 3, 2026
View
Version 24
Solicitation
Posted: Mar 3, 2026
View
Version 23
Solicitation
Posted: Feb 4, 2026
View
Version 22
Solicitation
Posted: Dec 17, 2025
View
Version 21
Solicitation
Posted: Dec 3, 2025
View
Version 20
Solicitation
Posted: Dec 3, 2025
View
Version 19
Solicitation
Posted: Dec 1, 2025
View
Version 18
Solicitation
Posted: Dec 1, 2025
View
Version 17
Solicitation
Posted: Dec 1, 2025
View
Version 16
Solicitation
Posted: Nov 24, 2025
View
Version 15
Solicitation
Posted: Nov 24, 2025
View
Version 14
Solicitation
Posted: Nov 12, 2025
View
Version 13Viewing
Solicitation
Posted: Nov 10, 2025
Version 12
Solicitation
Posted: Nov 10, 2025
View
Version 11
Solicitation
Posted: Oct 2, 2025
View
Version 10
Solicitation
Posted: Oct 2, 2025
View
Version 9
Solicitation
Posted: Oct 2, 2025
View
Version 8
Solicitation
Posted: Oct 1, 2025
View
Version 7
Solicitation
Posted: Oct 1, 2025
View
Version 6
Solicitation
Posted: Oct 1, 2025
View
Version 5
Solicitation
Posted: Sep 25, 2025
View
Version 4
Solicitation
Posted: Sep 25, 2025
View
Version 3
Solicitation
Posted: Sep 24, 2025
View
Version 2
Solicitation
Posted: Sep 24, 2025
View
Version 1
Solicitation
Posted: Sep 24, 2025
View