F35 SPECIAL ACCESS PROGRAM FACILITY (SAPF)

SOL #: W9127S25RA001Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W076 ENDIST FT WORTH
FORT WORTH, TX, 76102-6124, United States

Place of Performance

Place of performance not available

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Other Airfield Structures (Y1BZ)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 10, 2025
2
Last Updated
Feb 18, 2026
3
Submission Deadline
Feb 13, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, W076 ENDIST FT WORTH, has issued a Solicitation for the F35 SPECIAL ACCESS PROGRAM FACILITY (SAPF) construction project at Ebbing Air National Guard Base, Fort Smith, AR. This project involves the construction of a Squad Operations Mission Planning Facility designed to provide ICD 705 compliant secure flight planning and training, unclassified aircrew training, administrative space, aircrew flight equipment storage and maintenance, and a step desk for combat crew functions. Multiple amendments, including Amendment 0004, have been issued, extending the proposal due date to February 13, 2026.

Scope of Work

The core requirement is the construction of a specialized facility to support F-35 operations. This includes:

  • Controlled workspace for ICD 705 compliant secure flight planning and training.
  • Unclassified aircrew training and administrative areas.
  • Aircrew flight equipment storage and maintenance facilities.
  • A step desk to support combat crew functions.

Key Amendments (Amendment 0004)

Amendment 0004, posted on January 23, 2026, introduces significant revisions and clarifications:

  • Response Date Extension: The deadline for receipt of offers has been extended to February 13, 2026.
  • Revised Specifications:
    • Section 09 06 00 (Schedules for Finishes): Edited tile product names and provided detailed color schedules for all exterior and interior finishes (e.g., brick, metal panels, paint, flooring, ceiling, casework).
    • Section 11 14 00 (Pedestrian Control Equipment): Updated requirements for turnstiles, including ASTM standard updates, submittal clarifications, detailed material specifications (304 stainless steel), dimensions, operational features (bi-directional electric, access control integration), installation, and mandatory manufacturer training.
  • Revised Drawings:
    • All Drawings: A comprehensive set of drawings has been provided, including "PRELIMINARY EMBELLISHMENT SCHEDULE" and various "PLANT SCHEDULE" sheets for different bid options and areas.
    • Specific revisions include updates to the Room Finish Legend (A-703.1), plant quantities in Landscape Planting Plans (LP110.1, LP112.1, LP113.1, LP116.1), and the addition of detention basin details (LP112.1, LP503.1).

Contract & Timeline

  • Opportunity Type: Solicitation
  • Product Service Code: Y1BZ (Construction Of Other Airfield Structures)
  • Agency: DEPT OF DEFENSE / DEPT OF THE ARMY / W076 ENDIST FT WORTH
  • Set-Aside: Not specified
  • Proposal Due: February 13, 2026, 7:00 PM EST
  • Published Date: January 28, 2026

Submission Impact

Bidders must acknowledge receipt of Amendment 0004. It is critical to review all updated specifications and drawings to ensure proposals accurately reflect the latest requirements, particularly regarding finishes, pedestrian control equipment, and landscaping details. Any changes to previously submitted offers must be made via letter or electronic communication prior to the new deadline.

Contacts

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
View
View
View
View

Versions

Version 8
Solicitation
Posted: Feb 18, 2026
View
Version 7
Solicitation
Posted: Feb 11, 2026
View
Version 6
Solicitation
Posted: Feb 3, 2026
View
Version 5Viewing
Solicitation
Posted: Jan 28, 2026
Version 4
Solicitation
Posted: Jan 23, 2026
View
Version 3
Solicitation
Posted: Jan 16, 2026
View
Version 2
Solicitation
Posted: Jan 13, 2026
View
Version 1
Solicitation
Posted: Dec 10, 2025
View