FC300 Security Upgrades and Server Room Modernization
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for FC300 Security Upgrades and Server Room Modernization at MCB Camp Lejeune, NC. This is a Combined Synopsis/Solicitation for building construction, security enhancements, and server room infrastructure upgrades. Proposals are due April 27, 2026, at 2:00 PM EST.
Scope of Work
This project encompasses two main components:
- Server Room Modernization (Project 25-0447): Involves demolition of existing ceiling, lighting, mechanical items, and doors. Renovation includes installing a new 90-minute rated wood door with an X-10 GSA approved combination lock and metal frame, new acoustical tile ceiling, two new 48,000 BTU ceiling cassette heat pump condensers, and associated electrical work (new LED troffers, disconnects, circuit breakers, and relocation of existing outlets).
- Physical Security Upgrades (Project 25-0450): Focuses on enhancing physical security in Building FC300. This includes installing two new walls and doors, demolishing an existing door and wall, hardening ductwork, and sealing all penetrations for pipes, cables, and cable trays. The area must be secured with new walls and doors before demolition begins.
Contract Details
- Estimated Cost Range: Between $100,000 and $250,000.
- Contract Completion: 270 days after award.
- Liquidated Damages: $220 per Calendar Day.
- Basis for Award: Lowest Price.
- Bond Requirements: Vary by proposal value: no bonds for less than $35K; payment bond for $35K and greater; bid, payment, and performance bonds for $150K and greater.
- Place of Performance: Building FC300, Camp Lejeune, N.C.
Eligibility & Submission
- Eligibility: Only M&R MACC Contractors listed in the solicitation may submit a proposal. These include T.E. Davis Construction Company, Joyce & Associates Construction, Inc., Olympic Enterprises, Inc., and Quadrant Construction.
- Proposal Due Date: April 27, 2026, 2:00 PM EST.
- Submission Method: Proposals must be submitted via email to edward.e.pelser.civ@us.navy.mil and regenia.d.guest.civ@us.navy.mil.
- Requests for Information (RFIs) Cut-off: August 9, 2026, 3:00 PM EST. (Note: This RFI cut-off date is after the proposal due date; bidders should verify for potential amendments.)
- Proposal Acceptance Period: 60 days from receipt of offers.
- Buy American Act: Requirements apply to construction materials (FAR clause 52.225-9).
Key Deliverables & Requirements
- Submittals: Extensive submittal requirements include Schedule of Prices, Contact Personnel, Construction Schedule, Accident Prevention Plan, Quality Control Plan, Test Reports, Product Data, MSDS, maintenance data, warranty information, and as-built drawings. Submittals must be electronic (CD/DVD).
- Contractor Qualifications: Fabricator and installer must have a minimum of three years documented experience in similar projects.
- Site Conditions: Contractor is responsible for field verification of all measurements. The facility will remain open during the project.
- Environmental: Disposal of materials must comply with Camp Lejeune Sanitary Landfill regulations. Hot Work requires a written permit and fire watch.
- MAXIMO System: Bidders may need to use or populate a form for initial equipment inventory and replacement/update for the MAXIMO system.
Additional Notes
A site visit will be scheduled via amendment. Funding may not be available, and no award will be made if funds are not secured. Offerors will not be reimbursed for proposal costs. Wage determination details are provided, including rates for various construction trades and information on Executive Orders 13706 and 13658.