FC300 Security Upgrades and Server Room Modernization

SOL #: N4008526R9027Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 25, 2026
2
Last Updated
Apr 21, 2026
3
Submission Deadline
Apr 27, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for FC300 Security Upgrades and Server Room Modernization at Camp Lejeune, NC. This project involves comprehensive renovations to enhance physical security and modernize server room infrastructure. This opportunity is a Total Small Business Set-Aside and is restricted to specific M&R MACC Contractors. Proposals are due by April 27, 2026, at 2:00 PM EST.

Scope of Work

The project encompasses two main areas:

  • Server Room Modernization (Building FC300): Includes demolition of existing elements (ceiling, lights, mechanical items, door, electrical fixtures) and installation of new systems. This involves a new 90-minute rated solid core wood door and metal frame, new acoustical tile ceiling, two new 48,000 BTU ceiling cassette heat pump condensers, and new LED troffers to achieve 50 footcandles illuminance. Electrical work includes new disconnects, circuit breakers, and relocation of existing outlets.
  • Physical Security Enhancements (Building FC300): Involves the installation of two new walls and doors, demolition of an existing door and wall, and hardening of ductwork and sealing all penetrations for pipes, cables, and cable trays. The area must be secured with new walls and doors before demolition begins.

Contract Details

  • Contract Type: Combined Synopsis/Solicitation for Repair or Alteration of Miscellaneous Buildings (Z2JZ).
  • Estimated Cost Range: Between $100,000 and $250,000.
  • Contract Completion: 270 days after award.
  • Liquidated Damages: $220 per Calendar Day.
  • Basis for Award: Lowest Price.
  • Eligibility: Only M&R MACC Contractors listed on the General Requirements cover page may submit proposals. These include T.E. Davis Construction Company, Joyce & Associates Construction, Inc., Olympic Enterprises, Inc., and Quadrant Construction.
  • Bonds: Requirements vary based on proposal value: no bonds for less than $35K; payment bond for $35K and greater; bid, payment, and performance bonds for $150K and greater.
  • Buy American Act: Requirements apply to construction materials.

Key Dates & Actions

  • Published Date: April 9, 2026.
  • Requests for Information (RFI) Cutoff: April 17, 2026.
  • Site Visit: Scheduled for April 14, 2026, at 1000 at Building FC300. Attendees must confirm participation.
  • Proposal Due Date: April 27, 2026, 2:00 PM EST.
  • Proposal Acceptance Period: 60 days from receipt of offers.

Submission Requirements

Proposals must be submitted via email to edward.e.pelser.civ@us.navy.mil and regenia.d.guest.civ@us.navy.mil. Bidders must acknowledge receipt of all amendments with their proposal submission; failure to do so may result in rejection. The facility will remain open during the project, and the contractor is responsible for field verification of all measurements and quantities.

Contact Information

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: Apr 21, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 17, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Apr 9, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Mar 26, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 25, 2026
View