Z--FL-PELICAN ISLAND NWR-BUNKHOUSE ROOF

SOL #: 140FC126R0010Combined Synopsis/Solicitation

Overview

Buyer

Interior
Us Fish And Wildlife Service
FWS, CONSTRUCTION A/E TEAM 1
Falls Church, VA, 22041, United States

Place of Performance

Vero Beach, FL

NAICS

Roofing Contractors (238160)

PSC

Repair Or Alteration Of Other Residential Buildings (Z2FZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 15, 2026
2
Last Updated
May 15, 2026
3
Submission Deadline
May 29, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Fish and Wildlife Service is soliciting proposals for the replacement of the bunkhouse roof at Pelican Island National Wildlife Refuge in Vero Beach, FL. This project involves installing a new tin/zinc coated copper double-lock standing seam metal roof (SSMR) system. This is a 100% Total Small Business Set-Aside opportunity. Proposals are due May 29, 2026, by 5:00 PM EDT.

Scope of Work

The project requires a complete roof replacement, including:

  • Uninstalling and salvaging the existing rooftop photovoltaic (PV) system.
  • Full tear-off of the existing asphalt shingle roof and inspection for damage.
  • Removing and patching existing skylights.
  • Installing a new, watertight SSMR assembly, specifically tin/zinc coated copper (min. 20 oz, "Freedom Gray") with a mechanically-seamed, double-lock standing seam profile.
  • Providing and installing a new drainage system (seamless aluminum gutters, downspouts).
  • Providing and installing a new lightning and surge protection system compliant with Florida Building Code, NFPA 780, UL 96A, and NEC.
  • The roofing system must resist wind uplift pressures per ASCE 7.
  • Required warranties include a minimum 5-year contractor installation, 50-year material, 5-year manufacturer's no-dollar-limit, and 20-year paint finish warranty.

Contract Details

  • Contract Type: Firm Fixed Price
  • Estimated Magnitude: Between $100,000 and $250,000
  • Period of Performance: 365 calendar days after Notice to Proceed
  • Bonds: Bid Guarantee, Performance, and Payment Bonds are required.

Eligibility & Evaluation

  • Set-Aside: 100% Total Small Business Set-Aside
  • NAICS Code: 238160 - Roofing Contractors
  • Evaluation: Lowest Price Technically Acceptable (LPTA). Award will be made to the responsible Quoter with a technically acceptable, lowest-priced quotation.
  • Licensing: Offerors must submit a copy of their State of Florida Certified or Registered Construction Contractor or Roofing Contractor License.
  • Registration: Must be registered in the System for Award Management (SAM) prior to award.

Key Dates & Actions

  • Proposal Submission Deadline: May 29, 2026, 5:00 PM EDT (via email to john_ferrall@fws.gov).
  • Site Visit: Highly recommended and encouraged. Appointments accepted April 21-23, 2026. Contact Oliver Van Den Ende (772-205-0697) or Eric Verderber (772-584-2682) to schedule.
  • Requests for Information (RFIs) Due: May 1, 2026, 5:00 PM EDT (via email to john_ferrall@fws.gov).
  • Contracting Point of Contact: Drew Ferrall, john_ferrall@fws.gov.

Important Documents

Bidders should review the Statement of Work, Specifications (including General Requirements and prevailing wage rates), Drawings (architectural, structural, electrical, PV system details), and the Bid Schedule for comprehensive requirements. Amendment 1 clarifies drawing details and Amendment 2 extends the proposal deadline.

People

Points of Contact

Ferrall, JohnPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: May 15, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: May 12, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: May 11, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 15, 2026
View