Z--FL-PELICAN ISLAND NWR-BUNKHOUSE ROOF

SOL #: 140FC126R0010Combined Synopsis/Solicitation

Overview

Buyer

Interior
Us Fish And Wildlife Service
FWS, CONSTRUCTION A/E TEAM 1
Falls Church, VA, 22041, United States

Place of Performance

Vero Beach, FL

NAICS

Roofing Contractors (238160)

PSC

Repair Or Alteration Of Other Residential Buildings (Z2FZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 15, 2026
2
Last Updated
May 15, 2026
3
Submission Deadline
May 29, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Fish and Wildlife Service is soliciting proposals for the replacement of the bunkhouse roof at Pelican Island National Wildlife Refuge (NWR) in Vero Beach, FL. This project requires the installation of a tin/zinc coated copper double-lock standing seam metal roof (SSMR). Proposals are due May 29, 2026.

Scope of Work

The project involves a complete roof replacement, including:

  • Uninstalling and salvaging the existing rooftop photovoltaic (PV) system.
  • Performing a full tear-off of the existing asphalt shingle roof and inspecting underlying Structural Insulation Panels (SIPs) for damage.
  • Removing and patching existing skylights.
  • Installing a new, watertight SSMR system, specifically copper with tin-zinc coating ("Freedom Gray"), minimum 20 oz, mechanically-seamed, inverted-L, double-lock standing seam panels formed at the manufacturing plant.
  • Providing a new drainage system, including seamless aluminum gutters and minimum 4x4 downspouts.
  • Installing a new lightning and surge protection system compliant with Florida Building Code, NFPA 780, UL 96A, and NEC.
  • The roof must remain waterproof throughout all project stages. Fasteners must be stainless steel or copper alloy, and compatible sealants used. No roof airspace ventilation gaps.

Contract Details

  • Contract Type: Firm Fixed Price
  • Set-Aside: 100% Total Small Business Set-Aside
  • NAICS Code: 238160 - Roofing Contractors
  • Product Service Code: Z2FZ - Repair Or Alteration Of Other Residential Buildings
  • Estimated Magnitude: Between $100,000 and $250,000
  • Period of Performance: 365 calendar days after Notice to Proceed
  • Evaluation: Lowest Price Technically Acceptable (LPTA)

Key Requirements & Warranties

Offerors must be registered in SAM.gov and the prime contractor must hold a State of Florida Certified or Registered Construction Contractor or Roofing Contractor License. A Bid Guarantee, Performance, and Payment Bonds are required. Required warranties include:

  • 20-year watertight warranty.
  • 30-year PVDF finish warranty (if applicable).
  • 5-year contractor installation warranty.
  • 50-year or "lifetime" material warranty.
  • 5-year manufacturer's no-dollar-limit warranty. A 20-year paint finish warranty is required for applicable materials, but not for tin-zinc coated copper.

Submission & Deadlines

Proposals, including all required documents, must be submitted via email to john_ferrall@fws.gov by May 29, 2026, 5:00 PM EDT. The subject line must be "Proposal Submission-140FC126R0010". A site visit is highly recommended; appointments were accepted April 21-23, 2026, and May 20, 2026. Requests for Information (RFIs) are no longer being accepted as the deadline has passed.

Contact Information

For contractual inquiries, contact Drew Ferrall, Contract Specialist, at john_ferrall@fws.gov or 571-547-3230.

People

Points of Contact

Ferrall, JohnPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5Viewing
Combined Synopsis/Solicitation
Posted: May 15, 2026
Version 4
Combined Synopsis/Solicitation
Posted: May 12, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: May 11, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 15, 2026
View