Flooring Repair Buildings RR631-RR-633-RR635

SOL #: N4008526R9024Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Maintenance Of Other Administrative Facilities And Service Buildings (Z1AZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 26, 2026
2
Last Updated
Apr 29, 2026
3
Submission Deadline
May 4, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for Flooring Repair at Buildings RR631, RR633, and RR635 at MCB Camp Lejeune, North Carolina. This is a Total Small Business Set-Aside opportunity, restricted to pre-qualified M&R MACC Contractors. The estimated cost range is $500,000 to $1,000,000. Proposals are due May 04, 2026, at 2:00 PM EST.

Scope of Work

The project involves the removal of existing Luxury Vinyl Plank (LVP) flooring, floor sealing, and the installation of new Luxury Vinyl Tile (LVT) (e.g., Tarkett Provence 2131 or comparable) and wall base (e.g., Johnsonite Medium Gray or comparable). The scope also includes replacing damaged interior floor carpet, waxing, buffing, repairing thresholds, and replacing disturbed vinyl wall base. Contractors must apply sealant before flooring installation, clean up all work-related debris, repair any disturbed areas, and properly dispose of all waste off-site (Camp Lejeune dumpsters are not permitted). Architectural drawings provide detailed layouts and specifications for the repair areas.

Contract Details

  • Type: Combined Synopsis/Solicitation (Award based on Lowest Price)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Eligibility: Restricted to M&R MACC Contractors listed on the General Requirements cover page.
  • Estimated Value: $500,000 - $1,000,000
  • Period of Performance: 120 days after award
  • Liquidated Damages: $880 per Calendar Day
  • Bonds: Bid bonds (20% of proposal) required for proposals $150K+, Payment bonds for $35K+.
  • Applicable Regulations: Buy American Act, Executive Order 13706 (Paid Sick Leave).

Key Requirements

Contractors must adhere to numerous ASTM standards for materials and installation, and indoor air quality certifications are required for floor covering materials and adhesives. A 5-year warranty for defects and a 25-year non-prorated limited warranty against excessive surface wear are mandatory. Submittals include manufacturer's product specifications, technical data, shop drawings, product data, samples, test reports, and certificates. The "Marine Corps Base (MCB) Camp Lejeune Contractor Environmental Guide" outlines comprehensive environmental compliance obligations, including EMS, hazardous materials, waste management, and training, which are crucial for successful execution. Contractors are responsible for utility locator services and providing 48-hour notice before excavation.

Submission & Evaluation

Amendments

  • Amendment 0001: Replaced Wage Determination NC20260112 with NC20260010, added Division 1 specifications, and updated wage rates.
  • Amendment 0002: Provided answers to RFIs, clarifying the meeting location for a site visit at Building RR631 on Everett Creek Road.
  • Note: Offerors must acknowledge all amendments with their proposal.

Contacts

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Apr 27, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 8, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Apr 8, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Mar 26, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 26, 2026
View