Flooring Repair Buildings RR631-RR-633-RR635

SOL #: N4008526R9024Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Maintenance Of Other Administrative Facilities And Service Buildings (Z1AZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 26, 2026
2
Last Updated
Apr 29, 2026
3
Submission Deadline
May 4, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy / NAVFACSYSCOM MID-ATLANTIC is soliciting proposals for Flooring Repair at Buildings RR631, RR633, and RR635 located at MCB Camp Lejeune, North Carolina. This project, estimated between $500,000 and $1,000,000, is a Total Small Business Set-Aside and is restricted to M&R MACC Contractors listed on the General Requirements cover page. Proposals are due May 04, 2026, at 2:00 PM EST.

Scope of Work

The project involves comprehensive flooring repair, including:

  • Removal of existing Luxury Vinyl Plank (LVP) flooring.
  • Sealing of subfloors using Ardex or comparable products.
  • Installation of new Luxury Vinyl Tile (LVT), specifically Tarkett Provence 2131 6"x 48" or comparable.
  • Installation of Johnsonite Medium Gray wall base or comparable.
  • Replacement of damaged interior floor carpet, waxing, buffing, and repairs, including thresholds.
  • Replacement of disturbed vinyl wall base and application of sealant.
  • Contractor is responsible for moving furniture (tenants handle personal items) and disassembling/reconnecting modular furniture/cubicles with integral electrical/telecom wiring.
  • All work must meet or exceed attached specifications and manufacturer standards, including numerous ASTM standards and indoor air quality certifications.
  • Debris removal and disposal must be handled by the contractor; Camp Lejeune dumpsters are not to be used.

Contract Details & Requirements

  • Contract Type: Combined Synopsis/Solicitation, award based on Lowest Price.
  • Estimated Value: $500,000 - $1,000,000.
  • Period of Performance: 180 days after award (extended by Amendment 0004).
  • Place of Performance: Buildings RR631, RR633, and RR635 at MCB Camp Lejeune, NC.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Eligibility: Restricted to M&R MACC Contractors listed on the General Requirements cover page.
  • Warranties: Requires a 5-year warranty for defects in materials and workmanship, and a 25-year non-prorated limited warranty against excessive surface wear, static, delamination, etc.
  • Bonds: Bid bonds are required for proposals $150K and greater (20% of proposal amount). Payment bonds are required for proposals $35K and greater.
  • Environmental Compliance: Contractors must adhere to the "Marine Corps Base (MCB) Camp Lejeune Contractor Environmental Guide," covering EMS, hazardous materials, waste management, and training.
  • Special Notes: Work can be performed in all buildings simultaneously. No night, weekend, or special phasing work is required. Paid sick leave (EO 13706) and updated wage determinations (NC20260010) apply.

Submission & Evaluation

  • Basis for Award: Lowest Price.
  • Proposal Acceptance Period: 60 days from receipt of offers.
  • Acknowledgment: Offerors must acknowledge all amendments (0001, 0002, 0003, 0004) with their proposal; failure to do so may result in rejection.

Key Dates & Contacts

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Combined Synopsis/Solicitation
Posted: Apr 29, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Apr 27, 2026
View
Version 5Viewing
Combined Synopsis/Solicitation
Posted: Apr 23, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Apr 8, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 8, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 26, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 26, 2026
View