FTQW 20 0504 2 CHPP Electrical Upgrades

SOL #: FTQW2005042Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA5004 354 CONS PK
EIELSON AFB, AK, 99702-2200, United States

Place of Performance

Eielson AFB, AK

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 11, 2025
2
Last Updated
Feb 18, 2026
3
Submission Deadline
Feb 18, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting bids for FTQW 20 0504 2 CHPP Electrical Upgrades at Eielson Air Force Base, Alaska. This project involves upgrading and modifying the low voltage electrical and lighting systems at the Central Heat Power Plant (CHPP), including the removal and replacement of existing electrical panels, associated transformers, and outdated lighting fixtures. This is a Total Small Business Set-Aside.

Scope of Work

The project's objective is to replace existing low voltage electrical panels, lighting, and wiring in the CHPP and ash silo building. Key tasks include:

  • Demolition: Removal and disposal of existing electrical distribution and lighting systems, including fixtures, panelboards, junction boxes, conduit, and wiring, while maintaining CHPP operations. Hazardous and non-hazardous materials separation and disposal are required.
  • Power Distribution: Replacement of existing panelboards, transformers, and circuit conductors, including furnishing and installing new components and relocating existing circuits. Temporary power for critical loads during cutover is necessary.
  • Lighting Systems: Construction of new, fully functional lighting systems, including furnishing and installing new light fixtures, emergency lighting fixtures, and new lighting circuits. Work must comply with applicable codes (NEC, NFPA, OSHA), standards, and Eielson AFB specific requirements.

Contract Details

  • Contract Type: Firm Fixed Price
  • Period of Performance: 545 calendar days from the Notice to Proceed.
  • Estimated Magnitude: Between $1,000,000 and $5,000,000.
  • NAICS Code: 238210, with a Small Business Size Standard of $19M.
  • Set-Aside: Total Small Business Set-Aside.
  • Place of Performance: Eielson AFB Central Heating Plant, 2676 Industrial Drive, Eielson AFB, AK.

Key Dates & Submission

  • Bids Due: 20 January 2026, 02:00 PM AKDT.
  • Questions Due: 03 February 2026, 02:00 PM AKDT.
  • Site Visits:
    • 16 December 2025, 10:00 AM AKDT (attendee names due by 15 December 2025).
    • 29 January 2026, 12:30 PM AKDT (attendee names due by 17 February 2026).
  • Submission Method: Electronic bids only, via email to 354CONS.PKA.MonitorConstruction@us.af.mil (SrA Christopher Blackburn and Mr. Ryan Smith).

Evaluation & Requirements

Award will be based on price and price-related factors. Offerors must provide an offer guarantee and ensure offers are valid for at least 90 calendar days. Performance and Payment bonds are required. A Financial Institution Reference Sheet is necessary for responsibility determination. Funds are not presently available, and the Government reserves the right to cancel the solicitation.

Important Considerations

The project involves hazardous materials (asbestos, lead paint, PCBs, silica, heavy metals). Bidders should review the Hazardous Materials Report and assume two 20CY PCB roll-off containers and that all light fixtures contain hazardous materials. Strict coordination, security procedures for Eielson AFB, and compliance with environmental protection and waste management plans are mandatory. A detailed sequencing plan outlines work order, downtime limitations, and seasonal restrictions (May 15 - September 15 for panel/transformer work).

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Solicitation
Posted: Feb 18, 2026
View
Version 6
Solicitation
Posted: Feb 3, 2026
View
Version 5
Solicitation
Posted: Jan 26, 2026
View
Version 4Viewing
Solicitation
Posted: Jan 23, 2026
Version 3
Solicitation
Posted: Jan 22, 2026
View
Version 2
Solicitation
Posted: Jan 15, 2026
View
Version 1
Solicitation
Posted: Dec 11, 2025
View