FTQW 20 0504 2 CHPP Electrical Upgrades
SOL #: FTQW2005042Solicitation
Overview
Buyer
DEPT OF DEFENSE
Dept Of The Air Force
FA5004 354 CONS PK
EIELSON AFB, AK, 99702-2200, United States
Place of Performance
Eielson AFB, AK
NAICS
Electrical Contractors and Other Wiring Installation Contractors (238210)
PSC
Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Dec 11, 2025
2
Last Updated
Feb 18, 2026
3
Submission Deadline
Jan 20, 2026, 11:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force is soliciting bids for CHPP Electrical Upgrades at Eielson Air Force Base, AK. This project involves upgrading and modifying the low voltage electrical and lighting systems within the Central Heat Power Plant (CHPP) facility. This is a Total Small Business Set-Aside. Bids are due February 19, 2026, at 01:00 PM AKDT.
Scope of Work
The project, designated as the third and final phase of "Repair CHPP Electric Panels & Circuits, Phase C," requires the contractor to:
- Demolish and dispose of existing electrical distribution and lighting systems, including fixtures, panelboards, junction boxes, conduit, and wiring, ensuring separation of hazardous and non-hazardous materials.
- Replace existing electrical panels, associated transformers, and circuit conductors, including furnishing and installing new panelboards and feeders. Temporary power for critical loads during cutover is required.
- Construct new, fully functional lighting systems, including new light fixtures, emergency lighting fixtures, and new lighting circuits.
- Ensure the CHPP remains operational throughout the project, with work on certain panels and transformers restricted to "Summer" months (May 15 - September 15).
Contract Details
- Contract Type: Firm Fixed Price.
- Period of Performance: 545 calendar days from the Notice to Proceed.
- Estimated Magnitude: Between $1,000,000 and $5,000,000.
- NAICS Code: 238210, with a Small Business Size Standard of $19M.
- Set-Aside: 100% Total Small Business Set-Aside.
- Product Service Code: Z2JZ (Repair Or Alteration Of Miscellaneous Buildings).
- Funds: Not presently available; award is contingent upon fund availability.
Submission & Evaluation
- Electronic bids only must be submitted via email to both the Contract Specialist and Contracting Officer by February 19, 2026, at 01:00 PM AKDT.
- Bids will be publicly opened on February 19, 2026, at 01:00 PM AKDT.
- Questions were due by February 03, 2026, at 02:00 PM AKDT.
- Evaluation will be based on price and price-related factors.
- Performance and Payment Bonds are required, and an offer guarantee is necessary. Offers must be valid for at least 90 calendar days.
Special Requirements & Notes
- Hazardous Materials: The facility may contain hazardous materials (asbestos, lead paint, PCBs, silica, heavy metals). Contractors must comply with environmental protection measures, obtain HMMP approval, and manage waste according to regulations. Assume two 20CY PCB roll-off containers for bidding.
- Safety & Compliance: Adherence to governmental safety requirements (e.g., EM 385-1-1), NEC, NFPA, OSHA, and Eielson AFB specific standards is mandatory.
- Coordination: Extensive coordination is required for material movement, service interruptions, and work in specific areas like the coal thaw shed.
- Financial Verification: Bidders must complete and submit a "Financial Institution Reference Sheet" for responsibility determination.
- Wage Rates: Prevailing wage rates for Building and Heavy Construction in Alaska (AK20250001) apply.
People
Points of Contact
Christopher BlackburnPRIMARY
Christopher BlackburnSECONDARY
Files
Versions
Version 7
Solicitation
Posted: Feb 18, 2026
Version 6
Solicitation
Posted: Feb 3, 2026
Version 5
Solicitation
Posted: Jan 26, 2026
Version 4
Solicitation
Posted: Jan 23, 2026
Version 3
Solicitation
Posted: Jan 22, 2026
Version 2
Solicitation
Posted: Jan 15, 2026
Version 1Viewing
Solicitation
Posted: Dec 11, 2025