FTQW261406 Replace Upper Dgst Compressors
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The 354th Eielson Contracting Squadron is seeking qualification packages for Architect-Engineer (A-E) services for the replacement of upper digester compressors 1 & 2 at the Wastewater Treatment Plant (WWTP) at Eielson AFB, AK. This is a Presolicitation under a Total Small Business Set-Aside. Responses are due by February 26, 2026.
Scope of Work
The A-E services involve the design phase for replacing inoperable upper digester compressors 1 & 2, which currently cause improper sludge digestion and reduced gas production. The scope includes:
- Assessment of existing compressors, piping, and related appurtenances.
- Collecting and reviewing project data and records.
- Evaluation of alternatives and development of design concepts.
- Producing comprehensive drawings, schedules, specifications, and cost estimates for all construction facets.
- Designing for extreme Arctic conditions, including upgrading motor conductors, re-routing piping, and integrating new blowers into the SCADA system.
- Provisions for the abatement and disposal of hazardous materials, referencing the "WWTP Hazardous Materials Assessment, Nov 2024" report and requiring PCB testing on painted surfaces and concrete.
Contract & Timeline
- Opportunity Type: Presolicitation for A-E Services (Product Service Code C219).
- Set-Aside: Total Small Business (FAR 19.5).
- Place of Performance: Eielson AFB, AK.
- Design Delivery: 100% design required within 125 calendar days from the Notice to Proceed (NTP). Key design review milestones are 65%, 95%, and 100%.
- Response Due: February 26, 2026, 6:30 PM AKST.
- Published Date: February 4, 2026.
Submission Requirements
Interested firms must submit a combined package including:
- Instructions to Offerors (Evaluation Factors Document).
- SF-330 (Architect-Engineer Qualification-Standard Form 330), which details firm and team qualifications.
- Past Performance Questionnaire (PPQ), used to assess prior performance.
- A Basis of Estimate Template must be used for cost proposals, ensuring detailed breakdown of estimations and assumptions.
Key Documents
Bidders should review the provided documents, especially the Statement of Work (SOW) for detailed requirements, the WWTP Hazardous Materials Assessment for environmental considerations, and the SF-330 and PPQ forms for submission.
Agency & Contacts
- Department: Department of the Air Force, 354 CONS PK.
- Primary Contact: James Cameron (james.cameron.15@us.af.mil, 907-377-2706).
- Secondary Contact: SrA Christopher Prince (chirstopher.prince.3@us.af.mil, 907-377-3326).