FTQW261406 Replace Upper Dgst Compressors
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The 354th Eielson Contracting Squadron is seeking Architect-Engineer (A-E) services for the design of the replacement of upper digester compressors 1 & 2 at the Wastewater Treatment Plant (WWTP) at Eielson AFB, AK. This is a Presolicitation for a Total Small Business Set-Aside opportunity. The project addresses inoperable compressors, which currently lead to improper sludge digestion and potential freezing in Arctic conditions. Qualification packages are due by March 10, 2026, at 5:30 PM AKST.
Scope of Work
The A-E services encompass Title I Services (Design Phase), including:
- Assessment of existing compressors, piping, and related appurtenances.
- Collection and review of project data and records.
- Evaluation of alternatives and development of design concepts.
- Preparation of cost estimates and comprehensive construction documents (drawings, specifications, schedules) tailored for extreme Arctic conditions.
- Upgrading motor conductors, re-routing piping, and evaluating/integrating control panels and SCADA systems.
- Provisions for the abatement and disposal of hazardous materials, as identified in the provided WWTP Hazardous Materials Assessment, Nov 2024 document. This assessment details the presence of Asbestos-Containing Materials (ACM), Lead-Containing Materials, PCB-Containing Materials, and Mercury-Containing Materials within the WWTP buildings.
Contract & Timeline
- Contract Type: Presolicitation for A-E Services (C219 - Other Architect And Engineering Services).
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- Place of Performance: Eielson AFB, AK.
- Response Date: March 10, 2026, 5:30 PM AKST.
- Design Schedule: 100% design required within 125 calendar days from the Notice to Proceed (NTP), with intermediate submissions at 65% (45 days after NTP) and 95% (24 days after 65% Government Review).
Submission Requirements
Interested firms must submit a combined package including:
- Instructions to Offers (Evaluation Factors Document)
- SF-330 (Architect-Engineer Qualification): This form is critical for detailing firm and team qualifications, key personnel, and relevant project experience.
- Past Performance Questionnaire (PPQ): Used to gather detailed feedback on past contract execution, quality, and responsiveness.
Bidders should also utilize the provided Basis of Estimate Template for cost proposals, which guides on required cost data, assumptions, and special considerations for the project.