FTQW261406 Replace Upper Dgst Compressors

SOL #: 261406Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA5004 354 CONS PK
EIELSON AFB, AK, 99702-2200, United States

Place of Performance

Eielson AFB, AK

NAICS

Engineering Services (541330)

PSC

Other Architect And Engineering Services (C219)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 4, 2026
2
Last Updated
Mar 9, 2026
3
Response Deadline
Mar 10, 2026, 5:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The 354th Eielson Contracting Squadron is seeking Architect-Engineer (A-E) services for the replacement of upper digester compressors 1 & 2 at the Wastewater Treatment Plant (WWTP) at Eielson AFB, AK. This Presolicitation is a Total Small Business Set-Aside. The project requires comprehensive design services, including assessment, concept development, cost estimates, and production of construction documents tailored for extreme Arctic conditions. Qualification packages are due by March 10, 2026, at 5:30 PM AKST.

Scope of Work

The A-E services encompass Title I Services (Design Phase) for replacing the upper digester compressors. Key tasks include:

  • Assessment of existing compressors, piping, and related appurtenances.
  • Collection and review of project data and records.
  • Evaluation of alternatives and development of design concepts.
  • Preparation of cost estimates.
  • Production of complete design documents (drawings, schedules, specifications) after 65%, 95%, and 100% design review meetings.
  • Design must address upgrading motor conductors, re-routing piping, evaluating existing control panels and SCADA systems, and incorporating new blowers.
  • Provisions for abatement and disposal of hazardous materials disturbed during the project.

Contract Details & Timeline

  • Opportunity Type: Presolicitation for A-E Services.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Place of Performance: Eielson AFB, AK.
  • Design Schedule: 100% design delivery required within 125 calendar days from Notice to Proceed. Key milestones include 65% design (45 days), 95% design (24 days after 65% review), and 100% document preparation (14 days after 95% review).
  • Response Due: March 10, 2026, 5:30 PM AKST.
  • Published Date: March 9, 2026.

Submission Requirements & Evaluation

Offerors must submit an electronic .pdf qualification package including:

  • A cover letter with company information and teaming agreements.
  • A completed SF-330 Part I (contract-specific qualifications).
  • A separate SF-330 Part II for each firm on the team.
  • A Past Performance Questionnaire (PPQ).
  • Pricing information is NOT to be submitted with the SF-330; it will be requested later from the most qualified offeror.

Evaluation will follow The Brooks Act and FAR Subpart 36.6, considering:

  • Professional Qualifications: Key personnel (Mechanical Engineer, Electrical Engineer, Project/Program Manager with remote/challenging environment experience, Industrial Hygienist, Cost Estimator).
  • Specialized Experience and Technical Competence: Particularly in DoD facility design/investigations and Wastewater Treatment Plant design in Alaska. Example projects must be within the last seven years.
  • Capacity, Past Performance, and Geographic Proximity.
  • Firms with corporate/branch offices or subcontractors located in Alaska will be considered advantageous.
  • Discussions will be held with the top three firms, and pricing will be requested from the highest-ranked firm.

Special Considerations

The project involves potential hazardous materials. Bidders must review the "WWTP Hazardous Material Assessment, Nov 24" report. Testing for Polychlorinated Biphenyls (PCBs) on painted surfaces and concrete is required, and Asbestos-Containing Material (ACM) must be assumed where suspected. Special demolition procedures for hazardous materials must be specified.

Contact Information

People

Points of Contact

SrA Christopher PrinceSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Pre-Solicitation
Posted: Mar 9, 2026
Version 2
Pre-Solicitation
Posted: Mar 6, 2026
View
Version 1
Pre-Solicitation
Posted: Feb 4, 2026
View
FTQW261406 Replace Upper Dgst Compressors | GovScope