FY26 Wallace Creek BEQ Chiller Repairs

SOL #: N4008526R9013Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Camp Lejeune, NC

NAICS

Plumbing (238220)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 27, 2026
2
Last Updated
Mar 11, 2026
3
Submission Deadline
Mar 31, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFAC Mid-Atlantic, is soliciting proposals for FY26 Wallace Creek BEQ Chiller Repairs at MCB Camp Lejeune, NC. This project involves the replacement of six chillers and associated pumps. This opportunity is a Total Small Business Set-Aside but is restricted to specific Mechanical MACC Contractors listed in the solicitation. Proposals are due March 31, 2026, at 2:00 PM EST.

Scope of Work

This project entails the replacement of six specified chillers (WC105, WC110, WC115, WC120, WC130, WC135) and their associated pumps and drives at the Wallace Creek BEQ building. The scope also includes comprehensive hydronic piping system cleaning and flushing to remove deleterious substances. Contractors must adhere to the Marine Corps Base Camp Lejeune's environmental regulations and policies as detailed in the Contractor Environmental Guide. The facility will remain operational during construction, requiring minimal interference.

Contract Details

  • Contract Type: Combined Synopsis/Solicitation (Award based on Lowest Price)
  • Estimated Cost Range: $1,000,000 to $5,000,000
  • Period of Performance: 540 days after award
  • Liquidated Damages: $880 per Calendar Day
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Eligibility: Restricted to specific Mechanical MACC Contractors: Mechworks Mechanical Contractors, Inc., North State Mechanical, Inc., and R&W Construction Company, Inc.

Key Requirements

New chillers must include a 10-year parts, labor, and refrigerant warranty, factory-installed water strainers, and specific technical features such as VFDs for condenser fan motors, e-coat/topcoat finish for coils, Microchannel construction, seismic feet, and thermal dispersion flow switches. Controls must be BACnet/MSTP compatible. All piping 4" and below must be copper, and 5" and greater schedule 40 welded steel. The contractor must comply with the Buy America Act/Free Trade Agreement. Chiller manufacturer must have a service organization within 35 miles of Camp Lejeune, NC.

Submission & Evaluation

  • Proposal Due Date: March 31, 2026, at 2:00 PM EST
  • Requests for Information (RFIs) Cut-off: March 17, 2026, at 2:00 PM EST
  • Site Visit: March 11, 2026, at 0900 am EST at WC105
  • Basis for Award: Lowest Price
  • Proposal Acceptance Period: 60 days from receipt of offers
  • Bond Requirements: Vary based on proposal value (bid, payment, and performance bonds for proposals over $150K).
  • Submission Email: tony.d.benson.civ@us.navy.mil and lauren.f.loconto.civ@us.navy.mil

Environmental & Site Specifics

Contractors must review the "Contractor Environmental Guide" for MCB Camp Lejeune, which outlines environmental regulations, EMS, hazardous materials, and training requirements. All chemicals used for hydronic cleaning must be acceptable for discharge into the sanitary sewer. The contractor is responsible for recording and submitting pre- and post-installation water flow readings and providing Maximo Equipment Inventory Sheets.

Contacts

People

Points of Contact

Lauren LocontoSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 3
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Mar 5, 2026
View
Version 1Viewing
Combined Synopsis/Solicitation
Posted: Feb 27, 2026
FY26 Wallace Creek BEQ Chiller Repairs | GovScope