F--Groundwater Sampling of Monitor Wells, Grand Teton

SOL #: 140P1426Q0031Combined Synopsis/Solicitation

Overview

Buyer

Interior
National Park Service
IMR NORTHERN ROCKIES(12200)
YELWSTN NL PK, WY, 82190, United States

Place of Performance

Place of performance not available

NAICS

Environmental Consulting Services (541620)

PSC

Industrial Investigations, Surveys And Technical Support For Multiple Pollutants (F111)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 19, 2026
2
Last Updated
Mar 12, 2026
3
Submission Deadline
Mar 24, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, National Park Service is soliciting proposals for Annual Groundwater Sampling of Monitor Wells in Grand Teton National Park (GRTE) and the John D. Rockefeller Memorial Parkway. This requirement is a Total Small Business Set-Aside for a Firm-Fixed Price IDIQ contract. The purpose is to ensure compliance with Wyoming Department of Environmental Quality (WYDEQ) permit requirements. Proposals are due by March 24, 2026.

Scope of Work

The contractor will perform annual groundwater monitoring, including Spring (May/June) and Fall (September) sampling events. This involves analysis for a comprehensive list of parameters such as volatile organic compounds (VOCs), TAL Metals, ammonia, nitrate, COD, cyanide, chloride, fluoride, sulfate, TOC, TDS, bicarbonate/carbonate alkalinity, and formaldehyde for specific wells. Deliverables include completing WYDEQ GEMS Reports or using the WDEQ Water Quality Division Document Uploads Form, and performing statistical analysis on groundwater data. Biennial monitoring of seven wells at the Colter Bay Landfill site is also required. The contractor must provide a Health and Safety Plan (HASP), Work Plan/Sampling and Analysis Plan, and a Quality Assurance/Quality Control component.

Contract & Timeline

  • Contract Type: Single-Award, Firm-Fixed Price Indefinite Delivery Indefinite Quantity (IDIQ)
  • Period of Performance: May 4, 2026, to May 3, 2031 (five ordering periods)
  • Annual Work Period: May 1 to November 30
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 541620 (Environmental Consulting Service)
  • Small Business Size Standard: $19 Million
  • Proposal Due: March 24, 2026, at 19:00:00Z
  • Published: March 9, 2026

Submission Requirements

Offerors must submit a completed Price Schedule (Attachment 9), documentation of Prior Experience (three relevant contracts within the last five years, limited to 10 pages and counting towards the Technical Capability limit), and a Technical Capability submission (maximum 10 pages). Proposals should demonstrate relevant groundwater monitoring experience for key personnel (1-2 paragraphs per individual) and the company's past performance. Costs for HASP, monthly project management, and other non-sampling activities must be rolled into per-sample pricing. Offerors must be registered in the System for Award Management (SAM). Submissions are via email to Stacy_Vallie@nps.gov.

Evaluation Factors

Award will be made based on best value to the government, considering Price, Technical Capability, and Prior Experience.

Key Clarifications

Amendments have clarified that this is a Total Small Business Set-Aside, correcting an error in the original solicitation. The Period of Performance has been updated, and the proposal due date extended. Specific guidance has been provided on purge water and IDW disposal, required sampling techniques (U.S. EPA RCRA manual acceptable), and the inclusion of laboratory analysis in unit pricing.

People

Points of Contact

Vallie, StacyPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Mar 12, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Mar 12, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Mar 9, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Mar 5, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 27, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 19, 2026
View