F--Groundwater Sampling of Monitor Wells, Grand Teton

SOL #: 140P1426Q0031Combined Synopsis/Solicitation

Overview

Buyer

Interior
National Park Service
IMR NORTHERN ROCKIES(12200)
YELWSTN NL PK, WY, 82190, United States

Place of Performance

Place of performance not available

NAICS

Environmental Consulting Services (541620)

PSC

Industrial Investigations, Surveys And Technical Support For Multiple Pollutants (F111)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 19, 2026
2
Last Updated
Mar 12, 2026
3
Submission Deadline
Mar 12, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), under the Department of the Interior, is soliciting proposals for annual groundwater sampling of monitor wells in Grand Teton National Park (GRTE) and the John D. Rockefeller Memorial Parkway. This requirement is for a Firm-Fixed-Price, Single-Award Indefinite Delivery Indefinite Quantity (IDIQ) contract. Proposals are due March 12, 2026, at 1:00 p.m. MDT.

Scope of Work

The contractor will perform annual groundwater monitoring, including spring and fall sampling and analysis, to meet Wyoming Department of Environmental Quality (WYDEQ) permit requirements for GRTE and JODR wastewater systems. Key tasks include:

  • Collecting and analyzing samples for parameters such as volatile organic compounds (VOCs), TAL Metals, ammonia, nitrate, COD, cyanide, chloride, fluoride, sulfate, TOC, TDS, and bicarbonate/carbonate alkalinity. Formaldehyde analysis is required for three specific Gros Ventre wells.
  • Completing State of Wyoming Class V Package Plant Treatment (Ground Monitoring) Department of Environmental Quality Reporting Forms (GEMS Reports).
  • Providing a Health and Safety Plan (HASP), a Work Plan/Sampling and Analysis Plan, and a Quality Assurance/Quality Control (QA/QC) component.
  • Performing statistical analysis on groundwater data in accordance with WYDEQ Solid Waste Rules.
  • Conducting biennial monitoring of seven wells at the Colter Bay Landfill site.
  • Purge water disposal methods are specified, including scattering for annual monitoring and disposal at the Colter Bay Sewage System for landfill monitoring.

Contract Details

  • Type: Firm-Fixed-Price, Single-Award IDIQ
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 541620 (Environmental Consulting Service)
  • Small Business Size Standard: $19 Million
  • Period of Performance: May 4, 2026, to May 3, 2031 (five ordering periods).
  • Place of Performance: Various locations throughout Grand Teton National Park and John D. Rockefeller Memorial Parkway.

Submission Requirements

Offerors must submit a completed Price Schedule (Attachment 9), documentation of Prior Experience (three relevant contracts within the last five years, limited to 10 pages and counting towards the Technical Capability limit), and a Technical Capability submission (maximum 10 pages). Proposals must include a proposed methodology (work plan/sampling and analysis plan) and a HASP. Bidders must demonstrate relevant groundwater monitoring experience for key personnel (sampling individual and project manager/engineer) through 1-2 paragraph summaries, not resumes. All costs for HASP, monthly project management, and other non-sampling costs should be rolled into per-sample pricing. Registration in SAM is required.

Evaluation Criteria

Award will be made based on the best value to the government, considering Price, Technical Capability, and Prior Experience.

Key Dates & Contact

People

Points of Contact

Vallie, StacyPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 6
Combined Synopsis/Solicitation
Posted: Mar 12, 2026
View
Version 5Viewing
Combined Synopsis/Solicitation
Posted: Mar 12, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Mar 9, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Mar 5, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 27, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 19, 2026
View