Headquarters Building (HQB) Mechanical and Electrical Upgrades at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK.
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Aviation Administration (FAA) is soliciting proposals for Headquarters Building (HQB) Mechanical and Electrical Upgrades at the Mike Monroney Aeronautical Center (MMAC) in Oklahoma City, OK. This is a full and open competition for a Firm-Fixed Price Construction contract, estimated between $18,000,000.00 and $25,000,000.00. A mandatory pre-proposal conference and site visit is scheduled for April 23, 2026, and proposals are due May 15, 2026, by 4:00 PM CT.
Scope of Work
This opportunity involves comprehensive mechanical and electrical systems upgrades for HQB-001. The scope includes architectural and interior modifications, significant HVAC system overhauls (e.g., Air Handling Unit-1 replacement, HVAC terminal units, ductwork cleaning, and optional replacement), and electrical system enhancements (e.g., distribution upgrades, surge protective devices, generator/ATS replacement). Fire protection system upgrades, including the main fire alarm panel and an optional Emergency Responder Radio Coverage System (ERRCS), are also part of the project. Detailed specifications are provided in the Project Manual and Design Analysis documents.
Optional items for consideration include:
- HVAC Ductwork Replacement
- Lighting Controls Upgrade
- Replacement of Existing In-Slab Raceway Conductors
- Replacement of Carpet, Wall Base, and Painting of Walls
- Fire Alarm System Upgrade
- Installation of a New Emergency Responder Radio Coverage System (ERRCS)
Contract Details
- Contract Type: Firm-Fixed Price Construction
- Estimated Value: $18,000,000.00 to $25,000,000.00
- Set-Aside: Full and Open Competition
- Place of Performance: Mike Monroney Aeronautical Center, Oklahoma City, OK
Submission & Evaluation
- Proposals Due: May 15, 2026, by 4:00 PM CT.
- Submission Method: Electronically via email to andre.casiano@faa.gov.
- Mandatory Pre-Proposal Conference & Site Visit: April 23, 2026. Attendance is required; proposals from non-attendees will not be considered.
- Evaluation Criteria: Award will be based on "best value" to the Government, considering Technical Acceptability/Unacceptability, Relevant Experience and Past Performance, and Cost/Price.
- Required Submissions: Bidders must provide pricing using Attachment 1, detail past performance via Attachments 10, 11, and 12 (Client Authorization Letter), and submit notarized Anti-Non-Collusion (Attachment 16) and Business Relationship (Attachment 15) Affidavits. A Payment Bond (Attachment 7) is also required with the bid.
Compliance Requirements
Contractors must adhere to stringent safety and environmental protocols outlined in Chapter 33 Construction Safety (Attachment 5) and various Operational Control Documents (Attachment 9). Compliance with the U.S. Department of Labor Wage Determination (Attachment 6) for prevailing wage rates in Oklahoma County is mandatory. Key personnel, including a Construction Project Manager and Construction Superintendent, must meet specified experience requirements.