Headquarters Building (HQB) Mechanical and Electrical Upgrades at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK.
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Federal Aviation Administration (FAA) is soliciting proposals for Mechanical and Electrical Upgrades to the Headquarters Building (HQB) at the Mike Monroney Aeronautical Center (MMAC) in Oklahoma City, OK. This Firm-Fixed Price Construction contract is estimated between $18 million and $25 million. The project involves significant infrastructure modernization. Proposals are due May 28, 2026.
Scope of Work
This project entails comprehensive mechanical and electrical systems upgrades for HQB-001. Key elements include replacing Air Handling Unit (AHU)-1, HVAC terminal units, and cleaning ductwork. Electrical upgrades involve addressing code deficiencies, main service entrance surge protective devices, branch circuit protection, and generator/ATS replacement. Fire protection system upgrades, including the main fire alarm panel, are also part of the scope. The project also includes architectural and interior work such as new ceiling grids and electrical closets.
The solicitation includes six optional items for potential inclusion: HVAC ductwork replacement, lighting control upgrades, replacement of in-slab raceway conductors, carpet/wall base/paint replacement, fire alarm system upgrades, and installation of a new Emergency Responder Radio Coverage System (ERRCS). Project phasing has been eliminated, meaning the work will be performed under a single construction contract.
Contract Details
- Contract Type: Firm-Fixed Price Construction
- Estimated Magnitude: $18,000,000.00 to $25,000,000.00
- Competition: Full and Open Competition (No set-aside)
- Key Personnel: Requires a Construction Project Manager and Construction Superintendent with specific experience.
- Bonds: Performance and Payment Bonds (SF-25, SF-25A) will be required.
Submission & Evaluation
Offers must be submitted electronically to andre.casiano@faa.gov. Evaluation will be based on "best value" to the Government, considering Technical Acceptability/Unacceptability, Relevant Experience and Past Performance, and Cost/Price.
A mandatory pre-proposal conference and site visit was held on April 23, 2026. Proposals from offerors who did not attend will not be considered for award. Bidders must provide past performance information using the Past Performance Experience Form and facilitate client feedback via a Client Authorization Letter and Past Performance Survey.
Mandatory affidavits, including an Anti-Non-Collusion Affidavit and a Business Relationship Affidavit, must be electronically completed, signed, and notarized. Compliance with Chapter 33 Construction Safety and Operational Control Documents outlining environmental and occupational safety standards at MMAC is required. Bidders must also adhere to the Wage Determination for Oklahoma County.
Key Dates & Contacts
- Questions Due: May 13, 2026
- Proposal Due Date: May 28, 2026, 1600 CT
- Past Performance Survey Due Date: May 28, 2026
- Minimum Offer Acceptance Period: 120 calendar days
- Primary Contact: Cynthia Cooper, Cynthia.Cooper@faa.gov, 405-954-2601