Headquarters Building (HQB) Mechanical and Electrical Upgrades at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK.

SOL #: 6973GH-26-R-00082Combined Synopsis/Solicitation

Overview

Buyer

Transportation
Federal Aviation Administration
6973GH FRANCHISE ACQUISITION SVCS
OKLAHOMA CITY, OK, 73125, United States

Place of Performance

Oklahoma City, OK

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Office Buildings (Y1AA)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 14, 2026
2
Last Updated
May 23, 2026
3
Submission Deadline
Jun 3, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Aviation Administration (FAA) is soliciting proposals for Mechanical and Electrical Upgrades to the Headquarters Building (HQB) at the Mike Monroney Aeronautical Center (MMAC) in Oklahoma City, OK. This is a Firm-Fixed Price Construction contract with an estimated magnitude between $18M and $25M. Proposals are due June 3, 2026.

Scope of Work

This project involves comprehensive mechanical and electrical systems upgrades for HQB-001. The scope includes, but is not limited to, replacing Air Handling Unit (AHU)-1, HVAC terminal units, cleaning ductwork, upgrading electrical distribution, addressing code deficiencies, and replacing generators. Optional items include HVAC ductwork replacement, lighting control upgrades, in-slab raceway conductor replacement, fire alarm system upgrades, and installation of an Emergency Responder Radio Coverage System (ERRCS). The building will remain partially occupied during construction, and the contractor is responsible for protecting existing furniture, fixtures, and equipment.

Contract Details

  • Contract Type: Firm-Fixed Price Construction
  • Estimated Magnitude: $18,000,000.00 to $25,000,000.00
  • Set-Aside: None (Full and Open Competition)
  • Place of Performance: Mike Monroney Aeronautical Center, Oklahoma City, OK
  • Minimum Offer Acceptance Period: 120 calendar days

Key Amendments & Clarifications

  • Amendment 0003 (May 23, 2026): Extended the proposal and Past Performance Survey due dates to June 3, 2026. Incorporated a comprehensive Questions and Answers (Q&A) log (159 items), Addendum 02 (revising construction waste management and drawing sheets), Asbestos Abatement Information (abatement by owner prior to contractor start, scheduled Feb 11, 2027 to Mar 10, 2027), HQB Furniture Information (furniture plans and relocation constraints), and HQB Requested Photos.
  • Amendment 0002 (May 15, 2026): Revised Provision M.3, "Relevant Experience and Past Performance Evaluation," detailing criteria for evaluating offeror and subcontractor past performance and experience, including confidence ratings.
  • Amendment 0001 (May 1, 2026): Incorporated Addendum 01 (eliminating project phasing), new/revised AMS Clauses, and the Site Visit Attendees list.

Submission & Evaluation

  • Proposals Due: June 3, 2026, 21:00 UTC (4:00 PM CT)
  • Submission Method: Electronically via email to andre.casiano@faa.gov.
  • Evaluation: "Best value" to the Government, considering Technical Acceptability/Unacceptability, Relevant Experience and Past Performance, and Cost/Price.
  • Mandatory Site Visit: A mandatory pre-proposal conference and site visit was held on April 23, 2026. Proposals from offerors who did not attend will not be considered.
  • Required Forms: Bidders must submit an Anti-Non-Collusion Affidavit, Business Relationship Affidavit, Past Performance Experience Form, Client Authorization Letters, and a Past Performance Survey (due June 3, 2026).
  • Bonds: Payment and Performance Bonds are required.

Important Attachments

Key documents include the Design Analysis, Project Manual (100% Design Submission), Detailed Drawings (Electrical Power Plans), Major Cost Element Breakdown, Pricing Structure (CLINs for base and optional items), Construction Safety Chapter, Operational Control Documents, and Wage Determination for Oklahoma County.

Contact Information

Primary Point of Contact: Cynthia Cooper, Cynthia.Cooper@faa.gov, 405-954-2601.

People

Points of Contact

Cynthia CooperPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Combined Synopsis/Solicitation
Posted: May 23, 2026
Version 3
Combined Synopsis/Solicitation
Posted: May 15, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: May 1, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 14, 2026
View