Heat Treat Oven

SOL #: N6852026Q1023Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
FLEET READINESS CENTER
PATUXENT RIVER, MD, 20670, United States

Place of Performance

Virginia Beach, VA

NAICS

Industrial Process Furnace and Oven Manufacturing (333994)

PSC

Metal Heat Treating And Non Thermal Treating Equipment (3424)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Nov 5, 2024
2
Last Updated
Apr 22, 2026
3
Submission Deadline
Apr 16, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, specifically the Commander, Fleet Readiness Center (COMFRC) Procurement Group (PG), is soliciting quotes for one Heat Treat Oven with an integrated Quench Tank for the Fleet Readiness Mid Atlantic Oceana, Virginia Beach, Virginia. This is a Total Small Business Set-Aside. An amendment has extended the quote submission deadline to April 16, 2026, at 2:00 PM EST.

Scope of Work

The requirement is for a complete, fully functional, and ready-to-operate Heat Treat Oven designed for heat treating various aircraft components. Key specifications include a chamber of 24" H x 24" W x 48" L, 460V, 3 Phase, 60 Hertz, and capable of reaching up to 1200°F with Class 1 temperature uniformity (+/- 5F). The oven must feature structural steel construction, multilayered insulation, stainless steel components, an air-operated vertical lift door, heavy-duty motor and fan, atmosphere ports, a PID controlled temperature system with high limit, and a videographic recorder. The integrated quench system requires a basket/roller hearth design, with a typical quench time of 5-15 seconds for .032-.063 thick aluminum and a maximum load weight of 15-20 lbs. Electric heating is preferred. The contractor must also provide two electronic copies of technical data (operation, maintenance, diagnostic) and comply with Item Unique Identification (IUID) requirements.

Contract Details

  • Type: Firm Fixed Price (FFP)
  • Solicitation Number: N6852026Q1023
  • NAICS Code: 333994 (Industrial Process Furnace and Oven Manufacturing)
  • Set-Aside: Total Small Business
  • Place of Performance: Fleet Readiness Center Mid Atlantic (FRCMA), NAS Oceana, Virginia Beach, Virginia.

Submission & Evaluation

Offerors must submit a complete quote package conforming to Section 3.0 of the Statement of Work. The entire quotation must be contained in a single email not exceeding 5 megabytes. Evaluation will be based on Lowest Price Technically Acceptable (LPTA), assessing technical acceptability (Acceptable/Unacceptable) and price reasonableness. Offerors must be registered in the System for Award Management (SAM).

Key Updates & Deadlines

  • Amendment 0001 revised specific Statement of Work paragraphs (3.3.1, 3.1.2, 3.12.4, 3.12.5, 3.12.6) for clarification.
  • FAR Clauses 52.225-1 (Buy American Act—Supplies) and 52.225-2 (Buy American Act Certificate) have been added.
  • Quote Submission Deadline: April 16, 2026, at 2:00 PM EST.
  • Questions Due (Past): April 6, 2026, 2:00 PM EDT. Responses to questions were posted on April 8, 2026.

Contact Information

Primary Point of Contact: Brandon Fabricante (gregory.b.fabricante2.civ@us.navy.mil).

People

Points of Contact

Brandon FabricantePRIMARY
Beverley RhamdeowSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download

Versions

Version 9
Combined Synopsis/Solicitation
Posted: Apr 22, 2026
View
Version 8
Combined Synopsis/Solicitation
Posted: Apr 21, 2026
View
Version 7
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Apr 15, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Apr 14, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Apr 13, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Apr 8, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 6, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Nov 5, 2024
View