Heat Treat Oven

SOL #: N6852026Q1023Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
FLEET READINESS CENTER
PATUXENT RIVER, MD, 20670, United States

Place of Performance

Virginia Beach, VA

NAICS

Industrial Process Furnace and Oven Manufacturing (333994)

PSC

Metal Heat Treating And Non Thermal Treating Equipment (3424)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Nov 5, 2024
2
Last Updated
Apr 22, 2026
3
Submission Deadline
Apr 24, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, specifically the Commander, Fleet Readiness Center (COMFRC) Procurement Group, is soliciting quotes for one Heat Treat Oven with an integrated Quench Tank for the Fleet Readiness Mid Atlantic Oceana in Virginia Beach, VA. This is a Total Small Business Set-Aside. The latest quote submission deadline is April 24, 2026, at 2:00 PM EST.

Scope of Work

The requirement is for a complete, fully functional, and ready-to-operate Heat Treat Oven designed for heat treating various aircraft components. Key specifications include:

  • Chamber Dimensions: 24" H x 32" W x 48" L (updated by Amendment 3).
  • Temperature Uniformity: Must meet AMS 2750 Class 2 standards of +/- 10°F (updated by Amendment 2).
  • Voltage: 460V, 3 Phase, 60 Hertz.
  • Maximum Temperature: Up to 1200°F.
  • Construction: Structural steel shell with 12-gauge sheet steel, minimum 6.5" multilayered insulation, and stainless steel components for rollers, liner, and quench tank.
  • Features: Air-operated vertical lift door with safety switch, heavy-duty motor and fan, atmosphere ports, PID controlled temperature system with high limit, videographic recorder, and a quench system with a roller hearth and load basket.
  • Deliverables: Two (2) electronic copies of technical data (operation, maintenance, diagnostic) are required per the Contract Data Requirements List (CDRL), which has an estimated value of $200,000.00. Item Unique Identification (IUID) is also required.

Contract Details

  • Contract Type: Firm Fixed Price (FFP)
  • Solicitation Number: N6852026Q1023
  • NAICS Code: 333994 (Industrial Process Furnace and Oven Manufacturing)
  • Set-Aside: Total Small Business
  • FAR Clauses: FAR 52.225-1 and 52.225-2 have been added.
  • Evaluation: Award will be based on a Lowest Price Technically Acceptable (LPTA) methodology, evaluating technical acceptability on an Acceptable/Unacceptable basis and price for reasonableness.

Submission & Timeline

  • Quote Submission Deadline: April 24, 2026, at 2:00 PM EST.
  • Submission Instructions: Offerors must submit a complete quote package conforming to SOW Section 3.0. The entire quotation must be contained in a single email not exceeding 5 megabytes. .zip or .exe files are not allowable attachments.
  • Contact: Primary contact is Brandon Fabricante at gregory.b.fabricante2.civ@us.navy.mil.
  • Registration: Offerors must be registered in the System for Award Management (SAM).

Amendments

This opportunity has undergone multiple amendments. Amendment 1 added FAR clauses and clarified SOW paragraphs. Amendment 2 revised temperature uniformity requirements and extended the deadline. Amendment 3 further updated chamber dimensions and extended the quote submission deadline to the current date. Offerors should review all amendments for the most current requirements.

People

Points of Contact

Brandon FabricantePRIMARY
Beverley RhamdeowSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 9
Combined Synopsis/Solicitation
Posted: Apr 22, 2026
View
Version 8Viewing
Combined Synopsis/Solicitation
Posted: Apr 21, 2026
Version 7
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: Apr 15, 2026
View
Version 5
Combined Synopsis/Solicitation
Posted: Apr 14, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 13, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 8, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 6, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Nov 5, 2024
View