J061--FY 26 Services (1X) - NYH Triennial Electrical Power Distribution System Maintenance and Testing
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA), Network Contract Office 02, has issued a combined synopsis/solicitation for triennial maintenance, testing, and inspection of the Electrical Power Distribution System (EPDS) at the New York Harbor VA Healthcare System, Margaret Cochran Corbin Campus. This requirement ensures the reliability and safety of the facility's electrical infrastructure. Quotes are due February 11, 2026.
Scope of Work
The contractor will provide all labor, materials, and equipment to perform triennial services, including:
- Testing & Inspection: Comprehensive NETA MTS testing for dry-type and oil-filled transformers (including oil/gas analysis).
- Thermographic Scanning: Infrared (IR) thermography for the entire facility to detect hot spots and connection issues.
- Generators: A four-hour generator load test.
- Compliance: Adherence to NFPA 70B, 70E, 110, VHA Directive 1028, and ANSI/NETA standards.
- Reporting: Immediate notification of critical deficiencies and submission of final PDF reports within five business days of inspection.
Contract & Timeline
- Type: Request for Quotation (RFQ)
- Set-Aside: Total Small Business
- Period of Performance: Work must be completed within six (6) months of award.
- Response Due: February 11, 2026, 12:00 PM EST (per Amendment 0002).
- Place of Performance: New York, NY 10010.
Evaluation
Award will be made via a comparative evaluation of quotes based on:
- Technical Capability: Ability to meet or exceed SOW requirements, including technician documentation and a performance plan.
- Past Performance: Assessment of risk based on previous records (CPARS, surveys, and knowledge of previous experience).
- Price: Total sum of all line items on the provided pricing worksheet.
Additional Notes
Recent amendments clarified that the equipment was not maintained during the 2023 triennial cycle. Contractors are responsible for providing their own power source for testing if facility generators are unavailable. On-site parking is limited to one coordinated vehicle.