J080--Patch and paint all walls in ER department

SOL #: 36C26226Q0164Combined Synopsis/Solicitation

Overview

Buyer

Veterans Affairs
Veterans Affairs, Department Of
262-NETWORK CONTRACT OFFICE 22 (36C262)
Gilbert, AZ, 85297, United States

Place of Performance

North Hills

NAICS

Painting and Wall Covering Contractors (238320)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Brushes, Paints, Sealers, And Adhesives (J080)

Set Aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Timeline

1
Posted
Jan 23, 2026
2
Last Updated
Feb 20, 2026
3
Submission Deadline
Mar 3, 2026, 12:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Veterans Affairs (VA), Network Contracting Office 22, has issued a Combined Synopsis/Solicitation for Emergency Department Patch and Paint services at the VA Greater Los Angeles Healthcare System. This Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside requires patching and painting approximately 12,500 square feet of walls and hard lid ceilings in the ER department to meet infection control standards. Offers are due by March 2, 2026, at 5:00 PM MST.

Scope of Work

The contractor will provide all necessary supplies, equipment, travel, labor, and personnel to perform full patch and paint services. Key requirements include:

  • Patching and painting approximately 12,500 sq ft of walls and hard lid ceilings with a smooth texture.
  • Removing and re-installing switch and receptacle cover plates.
  • Applying two coats of Sherwin Williams Super Paint, matched to existing colors, with hard lid ceilings painted bright white.
  • Protecting VA property from paint dust and debris.
  • Coordinating work with the Nurse Manager or Charge Nurse and adhering to a projected schedule.
  • Complying with Cal-OSHA requirements, VA Policy, and strict Infection Control Requirements for the Emergency Department (Level IV Highest Risk).
  • Providing all appropriate PPE and cleaning items. Work must be flexible to accommodate the ED's patient volume, with space turned over each shift and no areas closed for more than one shift.

Contract Details

  • Contract Type: Firm-Fixed-Price.
  • Period of Performance: 90 Days.
  • Work Hours: Scheduled between 11:00 PM - 07:00 AM, Monday through Friday. Weekends and holidays may be included at no additional cost to the VA. Working days can be 7 days a week if necessary.
  • Set-Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB).
  • NAICS Code: 238320 (Painting and Wall Covering Contractors), Size Standard: $19 Million.
  • Product Service Code: J080.

Submission & Evaluation

  • Offer Due Date: March 2, 2026, 5:00 PM MST.
  • Submission: Offers must be submitted electronically to kyle.cipra@va.gov.
  • Required Files: General Information and Price/Cost Schedule, Experience, and Technical Requirements.
  • Evaluation: Award will be based on a comparative evaluation (FAR 13.106-2(b)(3)) considering price, technical factors, and past performance.
  • Eligibility: Offerors must be registered in the VA's financial system (Customer Engagement Portal).
  • Site Visit: A site visit was held on February 24, 2026, at 11:00 PM MST at the Greater Los Angeles VA Healthcare System.

Attachments

Key attachments include architectural drawings (blueprints) detailing the ER layout and a detailed schedule of paint systems and colors.

Point of Contact

Kyle Cipra, Contracting Specialist, kyle.cipra@va.gov, (562) 766-2328.

People

Points of Contact

Kyle CipraContracting SpecialistPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Combined Synopsis/Solicitation
Posted: Feb 20, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Feb 17, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Jan 23, 2026
View
J080--Patch and paint all walls in ER department | GovScope