KC-135 SIL Fuselage Wall
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force, specifically AFSC PZIMB SOFTWARE at Tinker Air Force Base, Oklahoma, is soliciting quotes for the KC-135 SIL Fuselage Wall Installation. This is an 8(a) Set-Aside opportunity for a Firm Fixed-Price contract to construct a structural wall enclosing the cut end of a KC-135 Fuselage trainer. Quotes are due by April 21, 2026, at 3:00 PM CST.
Scope of Work
The contractor shall provide all labor, tools, and expertise required to fabricate and install a structural wall on a government-owned KC-135 fuselage trainer. This wall is essential for creating a contained and usable workspace for the 555th Software Engineering Squadron (555 SWES). Key tasks include:
- Framing the wall with provided 2"x4" metal studs and track.
- Installing provided Rockwool insulation and .060 4x8 aluminum sheeting.
- Installing a provided 3' standard door with knockdown frame, panic bar, and hardware.
- Fabricating and installing a removable lower deck access door with quick-disconnect fasteners.
- Prepping, priming, and painting the new wall (interior and exterior) to match the existing KC-135 fuselage color (FS 36173 Grey).
Contract & Timeline
- Contract Type: Firm Fixed Price (RFQ under FAR Part 12 & 13)
- Set-Aside: 8(a) Set-Aside (FAR 19.8) / Small Business Set-Aside
- Period of Performance: April 28, 2026, to May 19, 2026 (as per solicitation); PWS indicates 60 days after receipt of order.
- Quote Submission Deadline: April 21, 2026, 3:00 PM CST
- Published Date: March 31, 2026
- Place of Performance: Tinker Air Force Base, Oklahoma
Evaluation & Award
Award will be made to the vendor who is technically acceptable with the lowest evaluated price. Evaluation will consider:
- Factor 1: Technical Proposal
- Factor 2: Cost/Price
- Review of Terms & Conditions, product documentation, technical merit, completed Quote Sheet, and contractor responsibility.
Special Requirements & Notes
- Site Visit: A site visit is scheduled for April 10, 2026, at 1300. Interested parties must provide their First Name, Last Name, Driver's License #, and State of Issue to the POC.
- Base Access: Personnel require a REAL ID to get on base.
- Government Furnished Materials (GFM): The Government will provide primary construction materials including metals (aluminum sheets, metal studs, track), door components, and insulation. The contractor is responsible for safeguarding GFM.
- Compliance: Contractors must be registered in SAM.gov. Wage determinations under the Service Contract Act apply.
- Contact: Primary point of contact is Brian Eakers at brian.eakers@us.af.mil. Secondary contact is Anthony Dollard at anthony.dollard@us.af.mil.