KC-135 SIL Fuselage Wall

SOL #: FA813926Q0014Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8139 AFSC PZIMB SOFTWARE
TINKER AFB, OK, 73145-3303, United States

Place of Performance

S Coffeyville, OK

NAICS

Other Foundation (238190)

PSC

Repair Or Alteration Of Other Non Building Facilities (Z2PZ)

Set Aside

8(a) Set-Aside (FAR 19.8) (8A)

Timeline

1
Posted
Mar 31, 2026
2
Last Updated
Apr 21, 2026
3
Submission Deadline
Apr 28, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for the KC-135 SIL Fuselage Wall project at Tinker Air Force Base, Oklahoma. This 8(a) Set-Aside opportunity requires a contractor to construct a structural wall to enclose the cut end of a KC-135 Fuselage trainer. The response deadline is April 28, 2026.

Scope of Work

The contractor shall provide all labor, tools, and expertise to fabricate and install a wall on a government-owned KC-135 fuselage. Key tasks include:

  • Framing the wall with government-provided 2"x4" metal studs and track.
  • Installing government-provided Rockwool insulation and .060 4x8 aluminum sheeting.
  • Installing a government-provided 3' standard door with knockdown frame, panic bar, and hardware.
  • Fabricating and installing a removable lower deck access door (approx. 3'x3' sheetmetal with quick-disconnect connectors).
  • Prepping, priming, and painting the new wall (interior and exterior) to match the existing KC-135 fuselage color (FS 36173 Grey). The contractor is responsible for sourcing paint and supplies, as well as all screws and fasteners.
  • Joints where the wall meets the fuselage must be water and weather-proofed with a flexible, paintable silicone sealant.
  • Construction will occur with the fuselage in its current ground position.

Contract Details

  • Contract Type: Firm Fixed Price
  • Set-Aside: 8(a) Set-Aside (FAR 19.8)
  • Product Service Code: Z2PZ - Repair Or Alteration Of Other Non Building Facilities
  • Place of Performance: Tinker Air Force Base, Oklahoma
  • Period of Performance: May 12, 2026, to June 12, 2026 (for Line Item 0001)
  • Government Furnished Materials: Metals (aluminum sheets, metal studs, track), door components, and insulation will be provided. A GFP spreadsheet is available.
  • Security & Safety: Contractor personnel require base access (REAL ID compliant), must comply with security, force protection, and antiterrorism requirements, and complete mandatory Air Force training. A Quality Control Plan and Safety Plan are required submittals.

Submission & Evaluation

  • Response Due Date: April 28, 2026, 8:00 PM Z
  • Submission Method: Emailed quotations are preferred.
  • Required Submittals: Wet-signed/dated solicitation pages, completed vendor information, pricing on pages 2 and 4, a company quotation sheet, a Quality Control Plan, a Safety Plan, and technical submittals demonstrating PWS compliance.
  • Evaluation: Award will be made to the technically acceptable vendor with the lowest evaluated price, considering Technical Proposal and Cost/Price.
  • Eligibility: Must be registered in SAM.

Additional Notes

Questions and Answers from the site visit (held April 10, 2026) have been added, clarifying details such as tax exemption, painting scope, access panel design, anchoring restrictions, and material responsibilities. Pictures of the fuselage cut end are also available.

People

Points of Contact

Anthony DollardPRIMARY
Anthony DollardSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Combined Synopsis/Solicitation
Posted: Apr 21, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Apr 15, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 13, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Mar 31, 2026
View