Level 1 Tube Connectors

SOL #: SPMYM326Q5027Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DLA MARITIME - PORTSMOUTH
PORTSMOUTH, NH, 03801-5000, United States

Place of Performance

Kittery, ME

NAICS

Fabricated Pipe and Pipe Fitting Manufacturing (332996)

PSC

Hose, Pipe, Tube, Lubrication, And Railing Fittings (4730)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 11, 2026
2
Last Updated
Mar 12, 2026
3
Submission Deadline
Mar 12, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA) Maritime - Portsmouth is soliciting quotations for Level 1 Tube Connectors for the Portsmouth Naval Shipyard in Kittery, ME. This is a Firm Fixed-Price requirement for "SPECIAL EMPHASIS material" critical for shipboard systems. Quotations are due by March 12, 2026.

Scope of Work

This opportunity requires the provision of Level 1 Tube Connectors in accordance with attached documents, including Technical Data Package (TDP) PN-TDP-0162 and Honeywell International Inc. drawing 3799950, Find No. 33, with specific modifications. These connectors are designated as "SPECIAL EMPHASIS material (Level I)" due to their critical use in shipboard systems where failure could have serious consequences.

Key Requirements for Vendors

  • Certifications: Manufacturer and vendor (if not the manufacturer) must possess an ISO 9001 certificate and a QA Manual (dated/reviewed within the last 3 years).
  • Site Visit: Both manufacturer and vendor must have completed a site visit.
  • Technical Compliance: Adherence to numerous standards and specifications, including SAE-AMS-QQ-S-763 (class 302 or 304 material), ANSI/ASQ Z1.4, ISO 9001, MIL-I-45208, and others.
  • Data Deliverables (CDRLs A & B): Contractors must provide extensive documentation, including Inspection and Test Plans (DI-QCIC-81110), Certification Data for Special Emphasis Material (DI-MISC-81020), and Test Certifications (DI-MISC-80678), specifically for Intergranular Corrosion Tests. These must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to shipment.
  • Quality Assurance: Government Quality Assurance (GQA) will be performed at the source.
  • Product Information: Vendors must list the country of origin for each line item. If not the actual manufacturer, the manufacturer's name, location, and business size must be provided. A Certificate of Compliance is required.

Contract Details

  • Type: Combined Synopsis/Solicitation (Request for Quotation - RFQ)
  • Pricing: Firm Fixed Price
  • Set-Aside: Not a Small Business Set-Aside
  • Delivery Date: April 30, 2026
  • Payment Terms: Net 30 Days AFTER acceptance of material.

Submission & Evaluation

  • Quotations Due: March 12, 2026, at 5:00 PM EST.
  • Submission Method: Email quotations to robert.dowdle@dla.mil and DLA-KME-QUOTATIONS@DLA.MIL.
  • Quote Content: Include price(s), FOB point, Cage Code, point of contact (name and phone number), GSA contract number (if applicable), business size under the NAICS Code (4730 - Hose, Pipe, Tube, Lubrication, And Railing Fittings), and payment preference (GCPC or WAWF).
  • Capability: Each response must clearly indicate the quoter's capability to meet all specifications and requirements.
  • Evaluation: The solicitation references "Evaluation Factors for Award" in Section M, though specific details are not provided in the summaries.

Contact Information

People

Points of Contact

Robert DowdlePRIMARY
DLA-KME EMAIL BOXSECONDARY

Files

Files

Download
Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: Mar 12, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Mar 5, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Feb 25, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Feb 18, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Feb 11, 2026
View
Level 1 Tube Connectors | GovScope