Lighting installation for B704

SOL #: FA449726Q0020Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4497 436 CONS LGC
DOVER AFB, DE, 19902-5016, United States

Place of Performance

Dover AFB, DE

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Lighting Fixtures And Lamps (J062)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 10, 2026
2
Last Updated
May 6, 2026
3
Submission Deadline
May 18, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, specifically the 436 Civil Engineer Squadron at Dover Air Force Base, DE, requires a contractor for the removal and replacement of existing lighting with LED luminaires in Building 704. This is a Small Business Set-Aside combined synopsis/solicitation for commercial services, with the intent to award a Firm-Fixed-Price (FFP) contract. A site visit is scheduled for May 29, 2026. Quotes are due May 18, 2026.

Scope of Work

The contractor will provide all labor, materials, tools, and equipment for the project. Key tasks include:

  • Removal and proper disposal of all existing interior luminaires (including emergency egress and exit lights).
  • Installation of new LED luminaires as per the B704 Lighting Layout and Requirements, meeting specified minimum lumen and uniformity standards.
  • Installation of surge protective devices (SPDs) in MDP and Panel A.
  • Replacement of unserviceable existing lighting controls with like-kind devices.
  • Associated electrical services, ensuring compliance with NFPA 70 (National Electric Code, 2026 Edition) and other safety standards.
  • Work must be completed within 90 days.

Contract & Timeline

  • Contract Type: Firm-Fixed-Price (FFP) via Request for Quotation (RFQ).
  • Period of Performance: 90 Days.
  • Place of Performance: Building 704, Dover AFB, DE.
  • Set-Aside: Small Business Concerns.
  • NAICS Code: 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a $19,000,000.00 small business size standard.
  • Site Visit: May 29, 2026, at 2:00 P.M. EST. Interested vendors must email Binod Pathak (binod.pathak.1@us.af.mil) and Dimas Bernacchia (dimas.bernacchia.2@us.af.mil) to confirm attendance and facilitate visitor access. Attendees need valid driver's license, vehicle registration, and proof of insurance.
  • Questions Due: May 1, 2026, no later than 1:00 P.M. EST.
  • Quote Response Deadline: May 18, 2026, no later than 1:00 P.M. EST.
  • Published Date: April 21, 2026.

Evaluation

Award will be based on a competitive, best value continuum approach, specifically the Lowest Price Technically Acceptable (LPTA) method. Evaluation will consider Price and Technical factors. Technical volumes will be assessed as acceptable or unacceptable based on meeting minimum solicitation requirements. The government may conduct a price realism analysis.

Special Requirements

Contractors must be registered in SAM.gov. The Wage Determination (No. 2015-4217, Revision No. 32) for Kent County, Delaware, applies. Contractors are responsible for cleanup, disposal of debris, and adherence to Air Force safety and installation security regulations, including potential background investigations for unescorted access.

People

Points of Contact

Mr. Dimas BernacchiaSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: May 6, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 27, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 22, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 21, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 10, 2026
View