Lighting installation for B704

SOL #: FA449726Q0020Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4497 436 CONS LGC
DOVER AFB, DE, 19902-5016, United States

Place of Performance

Dover AFB, DE

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Lighting Fixtures And Lamps (J062)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 10, 2026
2
Last Updated
May 6, 2026
3
Submission Deadline
May 12, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, 436 CONS LGC, is soliciting quotations for LED lighting installation in Building 704 at Dover Air Force Base, DE. This Small Business Set-Aside opportunity requires contractors to remove existing lighting and install new LED luminaires, including associated electrical services. The acquisition is a Combined Synopsis/Solicitation and intends to award a Firm-Fixed-Price (FFP) contract.

Scope of Work

The contractor will provide all labor, materials, tools, and equipment for the complete removal and replacement of outdated interior light fixtures with LED luminaires in Building 704. Key tasks include:

  • Removal and proper disposal of all existing interior luminaires, including emergency egress and exit lights.
  • Installation of new LED luminaires as per the B704 Lighting Layout (Attachment 7) and meeting minimum lumen requirements specified in B704 Lighting Requirements (Attachment 8).
  • Installation of surge protective devices (SPDs) in MDP and Panel A.
  • Replacement of existing lighting controls if unserviceable. All work must comply with NFPA 70, UL 1449, and UL 1283 standards. A 5-year manufacturer's warranty is required for new luminaires and SPDs. Services are to be delivered within 90 days of award.

Contract Details

  • Contract Type: Firm-Fixed-Price (FFP)
  • Set-Aside: Small Business Concerns
  • NAICS Code: 238210 – Electrical Contractors and Other Wiring Installation Contractors
  • Small Business Size Standard: $19,000,000.00
  • Place of Performance: Building 704, Dover Air Force Base, DE
  • Period of Performance: 90 Days

Submission & Evaluation

This is a Request for Quotation (RFQ) under Simplified Acquisition Procedures. Quotes must be submitted via email to the specified points of contact, utilizing Attachment 2 (Quote Schedule) for pricing. A current registration in SAM.gov is required for award eligibility.

  • Evaluation Basis: Lowest Price Technically Acceptable (LPTA) approach. Technical volumes will be evaluated as acceptable or unacceptable based on meeting minimum solicitation requirements. Price will be evaluated based on Total Evaluated Price (TEP).
  • Technical Approach: Quoters must clearly explain how they intend to ensure successful contract performance in accordance with the Statement of Work (SOW).

Key Deadlines

  • Site Visit Attendance Confirmation: Monday, April 27, 2026, at 10:00 A.M. EDT.
  • Site Visit: Wednesday, May 29, 2026, at 2:00 P.M. EST (Meeting at Dover AFB Visitors Center).
  • Questions Due: May 23, 2026, no later than 1:00 P.M. EST.
  • Quotes Due: Tuesday, May 12, 2026, no later than 1:00 P.M. EDT.

Points of Contact

People

Points of Contact

Mr. Dimas BernacchiaSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: May 6, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 27, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Apr 22, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Apr 21, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 10, 2026
View