Lighting installation for B704

SOL #: FA449726Q0020Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4497 436 CONS LGC
DOVER AFB, DE, 19902-5016, United States

Place of Performance

Dover AFB, DE

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Lighting Fixtures And Lamps (J062)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 10, 2026
2
Last Updated
May 6, 2026
3
Submission Deadline
May 12, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, 436 Civil Engineer Squadron, Dover Air Force Base (DE), is soliciting quotes for LED lighting installation in Building 704. This requirement involves the removal of existing fixtures and installation of new LED luminaires, including associated electrical services. The acquisition is a Small Business Set-Aside. Quotes are due Tuesday, May 12, 2026, by 1:00 P.M. EDT.

Scope of Work

The contractor will provide all labor, materials, tools, and equipment necessary for the complete removal and replacement of outdated interior light fixtures with new LED luminaires in Building 704 at Dover AFB. This includes:

  • Removal and proper disposal of all existing interior luminaires, including emergency egress and exit luminaires.
  • Installation of new LED luminaires as per the B704 Lighting Layout and meeting minimum lumen requirements.
  • Installation of surge protective devices (SPDs) in MDP and Panel A.
  • Replacement of existing lighting controls if unserviceable. All work must comply with NFPA 70 (National Electric Code, 2026 Edition), NFPA-101, and UL standards. A 5-year manufacturer's warranty is required for new luminaires and SPDs. The period of performance is 90 days.

Contract & Timeline

  • Type: Combined Synopsis/Solicitation (Request for Quotation - RFQ), with intent to award a Firm-Fixed-Price (FFP) contract.
  • NAICS: 238210 – Electrical Contractors and Other Wiring Installation Contractors
  • Small Business Size Standard: $19,000,000.00
  • Set-Aside: Small Business Concerns
  • Place of Performance: Building 704, Dover AFB, DE
  • Questions Due: May 1, 2026, by 1:00 P.M. EST.
  • Quotes Due: Tuesday, May 12, 2026, by 1:00 P.M. EDT.
  • Published Date: April 27, 2026.

Evaluation & Submission

Award will be based on a competitive, best value continuum approach, specifically Lowest Price Technically Acceptable (LPTA), considering the Highest Technical Rated with Fair and Reasonable Price. Technical volumes will be evaluated as acceptable or unacceptable based on meeting minimum requirements. Quoters must use Attachment 2 (Quote Schedule) for pricing and technical capability, and include company information. Quotes must be submitted via email to the specified points of contact. Current registration in SAM.gov is required for award eligibility.

Additional Notes

A site visit was held on Wednesday, April 29, 2026, at 2:00 P.M. EDT, but registration for attendance closed on April 27, 2026. This announcement constitutes the only solicitation; a separate written solicitation will not be issued. Numerous attachments are provided, including the Statement of Work (SOW), Quote Schedule, Provisions and Clauses, Instructions to Offerors Addendum, Evaluation Addendum, Wage Determination, Lighting Layout, Lighting Requirements, and Photometric Study. Points of Contact: Binod Pathak (binod.pathak.1@us.af.mil) and Dimas Bernacchia (dimas.bernacchia.2@us.af.mil).

People

Points of Contact

Mr. Dimas BernacchiaSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 5
Combined Synopsis/Solicitation
Posted: May 6, 2026
View
Version 4Viewing
Combined Synopsis/Solicitation
Posted: Apr 27, 2026
Version 3
Combined Synopsis/Solicitation
Posted: Apr 22, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 21, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 10, 2026
View