MAJOR MAINTENANCE & REPAIR (M&R) AT USCG SECTOR FIELD OFFICE, SOUTHWEST HARBOR, ME (HANCOCK COUNTY)

SOL #: 70Z0G126BSNNEDW01Pre-Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
CEU PROVIDENCE(000G1)
WARWICK, RI, 02886, United States

Place of Performance

Southwest Harbor, ME

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Other Administrative Facilities And Service Buildings (Z2AZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Oct 24, 2025
2
Last Updated
Jun 4, 2026
3
Response Deadline
Dec 9, 2025, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Coast Guard has awarded a contract to King Construction, Inc. for Major Maintenance & Repair (M&R) at the USCG Sector Field Office in Southwest Harbor, Maine. This project, awarded on June 4, 2026, was a Total Small Business Set-Aside and falls under the Repair Or Alteration Of Other Administrative Facilities And Service Buildings (Z2AZ) product service code.

Scope of Work

The awarded contract encompasses comprehensive maintenance and repair work across multiple facilities, including a base bid and three optional bid items. The original solicitation estimated the construction range between $1,000,000 and $5,000,000.

Base Bid Items (0001A, 0001B, 0001C) include:

  • Multi-Mission Building (MMB): Partial roofing replacement, floor and wall finishes, suspended ceilings, boiler hydronic circulation pump repair/replacement, AHU repair/replacement, ERV and fresh air/exhaust air system installation, second-floor sprinkler system, branch circuit replacement, shunt trip device installation, battery room circuit replacement, and fire alarm system.
  • Barracks/Galley Building (UPH): Messdeck flooring replacement, messdeck/galley fire shutters replacement, modular walk-in refrigeration and freezer box installation, lavatory and shower head replacement, ERV repair/replacement, boiler breeching evaluation/inspection, kitchen hood replacement, steam warming table replacement, and plumbing and fire alarm system.
  • Boat Maintenance Facility (BMF): Fire alarm system installation.

Optional Bid Items include:

  • ITEM 0002: MMB window and lintel replacement.
  • ITEM 0003: MMB roof replacement for all one-story roofs.
  • ITEM 0004: UPH copper water line replacement.

Contract Details

  • Awardee: King Construction, Inc.
  • Agency: US COAST GUARD, Department of Homeland Security
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: Z2AZ (Repair Or Alteration Of Other Administrative Facilities And Service Buildings)
  • Place of Performance: Southwest Harbor, ME 04679, United States
  • Award Date: June 4, 2026
  • Period of Performance: Work is to commence within 10 calendar days of notice to proceed and be completed within 362 calendar days. Optional items, if exercised at award, maintain the 362-day period; if exercised later, the period may extend up to 60 days.

Additional Notes

An abstract of offers indicates that King Construction Services, Inc. was among several offerors, including Phelan Construction, LLC; CCI Prime Contractors, LLC; Campbell Construction Group, LLC; McKenzie Construction & Site Development, LLC; and Imperial Construction & Electric, Inc. The solicitation required a 20% bid guarantee and will require 100% Performance and Payment Bonds. Multiple amendments were issued during the solicitation phase, clarifying specifications, extending bid due dates, and addressing vendor questions, including details on glazing, fire alarm systems, and hazardous materials.

People

Points of Contact

Daniel B WalkerPRIMARY

Files

Files

No files attached to this opportunity

Versions

Version 11
Award Notice
Posted: Jun 4, 2026
View
Version 10
Solicitation
Posted: Jun 4, 2026
View
Version 9
Solicitation
Posted: Mar 3, 2026
View
Version 8
Solicitation
Posted: Feb 25, 2026
View
Version 7
Solicitation
Posted: Feb 23, 2026
View
Version 6
Solicitation
Posted: Feb 11, 2026
View
Version 5
Solicitation
Posted: Feb 5, 2026
View
Version 4
Solicitation
Posted: Feb 4, 2026
View
Version 3
Solicitation
Posted: Jan 9, 2026
View
Version 2
Pre-Solicitation
Posted: Jan 9, 2026
View
Version 1Viewing
Pre-Solicitation
Posted: Oct 24, 2025