S--MAVA REPLACE FIRST FLOOR CARPETING

SOL #: 140P4526Q0002Combined Synopsis/Solicitation

Overview

Buyer

Interior
National Park Service
NER SUPPLY MABO(45000)
STATEN ISLAND, NY, 10305, United States

Place of Performance

Place of performance not available

NAICS

Broadwoven Fabric Mills (313210)

PSC

Carpet Laying And Cleaning (S214)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 19, 2025
2
Last Updated
Feb 11, 2026
3
Submission Deadline
Feb 3, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), under the Department of the Interior, is soliciting proposals for the replacement of first-floor carpeting at the Martin Van Buren National Historic Site (MAVA) in Kinderhook, NY. This opportunity is a Total Small Business Set-Aside. The project involves custom-manufacturing and installing natural fiber carpets to replicate historic patterns. Proposals are due February 3, 2026, at 2:00 PM EST.

Scope of Work

The contractor will be responsible for:

  • Manufacturing custom natural fiber carpets to match three distinct mid-19th century patterns for the main hall/stairwell, parlor/breakfast room, and library. Carpets must demonstrate very low VOC emissions.
  • Removing existing reproduction carpets and underlayment.
  • Installing new carpets and underlayment using tack strips, replicating original installation methods where possible. Adhesives are generally not permitted on stair treads without written permission.
  • Cleaning work areas using HEPA filtration vacuums during and after installation.
  • Repairing any damage incurred during work, with NPS approval.
  • Performing a mandatory site visit for accurate measurements and understanding installation requirements.

Contract & Timeline

  • Contract Type: Firm-Fixed Price Purchase Order.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Product Service Code: S214 (Carpet Laying And Cleaning).
  • Period of Performance: On-site work must occur during the off-season (November 1st, 2025 – April 30th, 2026, or November 1st, 2026 – April 30th, 2027).
  • Submission Deadline: February 3, 2026, at 2:00 PM EST.
  • Submission Method: Email to Linda_Richardson@nps.gov.
  • Published Date: January 20, 2026.

Submission & Evaluation

Offerors must submit:

  • Product samples, dyed yarn samples for color match, and detailed material descriptions (fiber content, VOCs, IAQ test results).
  • Project schedule, installation process description, product specifications, and Safety Data Sheets.
  • Installation personnel qualifications.
  • Price.
  • A Technical Questionnaire detailing project completion plan, experience, knowledge, equipment, and quality assurance.
  • A Past Performance Questionnaire with details on up to three relevant projects within the last five years.
  • Evaluation Factors: Technical Capability, Past Performance, and Price. Award will be made to the offer most advantageous to the Government.

Additional Notes

  • A Wage Determination (No. 2015-4173) for Columbia and Greene Counties, NY, applies, establishing minimum wage and fringe benefit rates under the Service Contract Act.
  • Work must be performed during regular business hours (7 am-5 pm, Monday-Friday) and only when NPS staff are present.
  • NPS will remove and protect furnishings.
  • Contact for questions and submissions: Linda Richardson (Linda_Richardson@nps.gov, 718-815-6151).

People

Points of Contact

Richardson, LindaPRIMARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: Feb 11, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Feb 3, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Jan 20, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Dec 19, 2025
View